Lexington Harbor Breakwater Repair
Sector: Aerospace & Defense • Location: MITN, United States of America
Source: MITN Purchasing Group
*** Bid Abstract is posted *** Amendment 0003 is issued to extend the bid due date , extend the bid opening date , extend the Request for Information period , revise a specification section . Reference the amendment document for full details .*** Amendment 0002 is issued to extend the bid due date , extend the
- Status
- Closed
- Sector
- Aerospace & Defense, Water Supply and Storage, Chemical (Industrial), Seaport, Manufacturing (Industrial), Cement
- Location
- MITN, United States of America
- Updated
- 3 Nov 2026
- Source
- MITN Purchasing Group
ConstructChat
Ask ConstructChat about Lexington Harbor Breakwater Repair
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | *** Bid Abstract is posted *** Amendment 0003 is issued to extend the bid due date , extend the bid opening date , extend the Request for Information period , revise a specification section . Reference the amendment document for full details .*** Amendment 0002 is issued to extend the bid due date , extend the bid opening date , incorporate Davis - Bacon Act Wage Determination MI20260049 , extend the Request for Information period , revise drawing and specification sheets , provide images of the work site without snow cover , provide the site visit attendee list . Reference the amendment document for full details . *** Amendment 0001 is issued to remove FAR Clause 52 . 236 - 27 - Site Visit ( Construction ) and to provide organized site visit information within Section 00 21 13 - Instructions to Bidders . Reference the amendment for full details .*** Lexington Harbor Breakwater Repair . This project includes breakwater repair operations at Lexington Harbor . The north breakwater is a permeable rubble mound structure and allows sand shoaling within the harbor . Voids in the north breakwater are exacerbating sediment infiltration within the harbor . A walkway is present atop the north breakwater . The walkway is approximately 5 feet wide and generally in good condition . The north breakwater voids are partially sand filled . The sand fill depth varies ; however , sand generally extends to the existing water elevation . The project objective is to alter the existing permeable rubble mound breakwater structure to an impermeable structure . The proposed scope of work includes constructing a grout curtain wall within the structure . The proposed grout curtain wall is chemical grout and a cementitious grout material . The chemical grout material is proposed within the sand filled breakwater structure . The cementitious grout material is proposed above the sand filled area . The intent of the grout curtain wall is to prevent sand from infiltrating through the breakwater structure . The existing Portland cement concrete walkway is reconstructed upon completion of grouting operations . As previously stated , the project includes breakwater repair by constructing a grout curtain wall and Portland cement concrete walkway reconstruction . Information regarding the U . S . Army Corps of Engineers process for settling requests for equitable adjustments and duration goals to achieve definitization of equitable adjustments for change orders under construction contracts can be found by going to https :// www . usace . army . mil / Strategic - Partnerships / Partnering / mod / 129895 / details / 443 / then scrolling down on right hand side of page by clicking on ? View FFP Contract Changes Playbook Here ?. |
Location
Country | United States of America (USA) |
State | MITN |
Source
Source | MITN Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Aerospace & Defense, Water Supply and Storage, Chemical (Industrial), Seaport, Manufacturing (Industrial), Cement |
Article published date | 2026-04-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Aerospace & Defense tenders in United States of America
- Indigent Defense Services for Misdemeanor Cases Public Defender
- Notice of Intent to Award a NonCompetitive Procurement for Siemens Logistics High Speed Diverters
- This is a Notification Only Continuing OnCall Architecture and Engineering Consulting Services W00486
- Electronic Gate Replacement
- INFORMATION TECHNOLOGY IT CONTINUING CONSULTING SERVICES
- Airport Terminal HVAC Improvements Phase II Vestibule Upgrades ReBid
- NonExclusive Airport Rental Car Concession
- Procurement Consulting Services
