Lift Station Redesign B20128
Combined synopsis/solicitation · Georgia
Source: SAM.gov
The Contractor shall provide all the tools, parts, materials, equipment, labor, transportation, startup, and training for a redesigned lift station to the Commodities Maintenance Group (CMXG) at Robins Air Force Base (AFB), Georgia. These lift stations will be used to transport liquid chemical waste that could present environmental danger (i.e. acid waste, chrome waste). Each Lift Station shall ha
- Status
- Prospective
- Sector
- Waste Processing and Treatment, Government, Steel, Commercial, Aerospace & Defense, Chemical (Industrial), Power Generation (CCGT), Manufacturing (Industrial), Residential, Water Supply and Storage
- Location
- Warner Robins, Georgia, United States of America
- Updated
- 3 Nov 2026
- Source
- SAM.gov
ConstructChat
Ask ConstructChat about Lift Station Redesign B20128
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | combined synopsis/solicitation |
Taiyo status | Prospective |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The Contractor shall provide all the tools, parts, materials, equipment, labor, transportation, startup, and training for a redesigned lift station to the Commodities Maintenance Group (CMXG) at Robins Air Force Base (AFB), Georgia. These lift stations will be used to transport liquid chemical waste that could present environmental danger (i.e. acid waste, chrome waste). Each Lift Station shall have the following features: • Two (2) electric pumps made of CPVC or 316 Stainless Steel. Pump fittings must be CPVC with a two (2) inch maximum nominal size. The pump flowrate should be 25 gallons per minute per pump. The pump must have a 30-foot total dynamic head. • The tank material shall be polypropylene, with a volume of 50 to 75 gallons and a single tank containment style. • The dimensions of the lift station shall be four (4) feet long, three (3) feet wide, and four (4) feet high. • The control panel enclosure shall be made of stainless steel. • The power supply shall be 120V or 208V. • Each pump shall have disconnect switches, hands-off-auto, and level sensors for automation on/off pump operation. |
Original sector | Construction |
Location
Country | United States of America (USA) |
State | Georgia |
City | Warner Robins |
Source
Source | SAM.gov |
URL |
More Details
Record type | Tender |
Sector | Waste Processing and Treatment, Government, Steel, Commercial, Aerospace & Defense, Chemical (Industrial), Power Generation (CCGT), Manufacturing (Industrial), Residential, Water Supply and Storage |
Article published date | 2026-07-11 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Waste Processing and Treatment tenders in United States of America
- Coatings for Wet Well and Manholes
- Sole Source for Wedeco UV BulbsBallets
- Chambers Creek Regional Wastewater Treatment Plant BNR Aeration Basin Airflow Meters
- Annual Construction Contract For Utility Replacement 2022A
- FY23 Sewer Rehabilitation
- Fire Station 32 ADA Restroom Improvements
- Foothills Trail East Puyallup McMillin Trailhead Improvements
- Pipeline Trail Phase 1 Project
