Liftstation Critical Parts FY26
The scope, dates and status of this tender. A free account opens every field.
Source: Missouri Purchasing Group
• Single Phase , 230 volt , for Sewage , Effluent & Non - Clog Pumps w / Start Components . • Enclosure Type 4x Polycarbon . • Circuit Breaker for pump and control circuit . • Contactor Definite purpose . • HOA switch three position toggle HP rated . • Alarm switch three position toggle HP rated . • Run light Amber neon
- Status
- Closed
- Sector
- Waste Processing and Treatment
- Location
- Missouri, United States of America
- Updated
- 3 Nov 2026
- Source
- Missouri Purchasing Group
ConstructChat
Ask ConstructChat about Liftstation Critical Parts FY26
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | • Single Phase , 230 volt , for Sewage , Effluent & Non - Clog Pumps w / Start Components . • Enclosure Type 4x Polycarbon . • Circuit Breaker for pump and control circuit . • Contactor Definite purpose . • HOA switch three position toggle HP rated . • Alarm switch three position toggle HP rated . • Run light Amber neon pilot light . |
Location
Country | United States of America (USA) |
State | Missouri |
Source
Source | Missouri Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Waste Processing and Treatment |
Article published date | 2026-04-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Waste Processing and Treatment tenders in United States of America
- Coatings for Wet Well and Manholes
- Sole Source for Wedeco UV BulbsBallets
- Chambers Creek Regional Wastewater Treatment Plant BNR Aeration Basin Airflow Meters
- Annual Construction Contract For Utility Replacement 2022A
- FY23 Sewer Rehabilitation
- Fire Station 32 ADA Restroom Improvements
- Foothills Trail East Puyallup McMillin Trailhead Improvements
- Pipeline Trail Phase 1 Project
