Liquid Salt Brine Maker
Sector: Advanced Electronics • Location: Idaho, United States of America
Source: Idaho Purchasing Group
1 AN AUTOMATIC BRINE MAKER SYSTEM must be a Accubrine ® NXT - Gen automated brine maker or equal and make the salt act as a filter bed as the water moves down through to the sump area and filter screen . The system must be capable of producing , at a minimum , two hundred ( 200 ) gallons of brine
- Status
- Closed
- Sector
- Advanced Electronics, Steel, Water Supply and Storage, Broadband, Telecommunications
- Location
- Idaho, United States of America
- Updated
- 3 Nov 2026
- Source
- Idaho Purchasing Group
ConstructChat
Ask ConstructChat about Liquid Salt Brine Maker
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | 1 AN AUTOMATIC BRINE MAKER SYSTEM must be a Accubrine ® NXT - Gen automated brine maker or equal and make the salt act as a filter bed as the water moves down through to the sump area and filter screen . The system must be capable of producing , at a minimum , two hundred ( 200 ) gallons of brine per minute or six thousand ( 6 , 000 ) gallons of brine per hour ( based on available water supply of six thousand ( 6 , 000 ) gallons per hour and storage tank configuration static discharge of forty - five ( 45 ) feet head pressure ) and at a minimum meet the following . 2 LIST OF MINIMUM REQUIREMENTS FOR THE SALT HOPPER : The salt hopper must have a minimum capacity of four point five ( 4 . 5 ) cubic yards ; The minimum inside dumping width must be no less than one hundred twenty ( 120 ) inches ; The salt hopper must be constructed of sixteen thousand ( 16 , 000 )- pound tensile - strength fiberglass and isophthalic resin with all inside surfaces coated with a ceramic resin zero point zero five zero ( 0 . 050 ) inches thick ; The vessel must have structural integral ribs allowing flex with the salt hopper from full to empty . The salt hopper must be capable of being cleaned via flush components of the unit , and any disassembly of components for cleaning is not acceptable ; Whether full or empty , the salt hopper must be able to be cleaned by opening the sump outlet cap and water flush valves . If the salt hopper is empty , the inside floor panel must have the capability of being removed for cleaning by attached lifting straps or another method allowing easy removal of the inside floor panel ; There must be a fresh water flushing system to force sediment to and out of the sump . All valves , bulkhead fittings , and related components one ( 1 ) inch and larger must be manifold - type fittings ; There must be a pressure transducer connected to the PLC to activate brine pump on and off and water flow into the salt tank . These levels must be adjustable from the HMI interface and adjustable to within one ( 1 )- inch increments and ; The transducer must have an air capillary to the inside of the salt hopper . 3 AUTOMATIC BRINE MAKER PRODUCTION SYSTEM EQUIPMENT 3 . 1 The vessel must have two ( 2 )- inch male cam - lock - type fittings and on / off ball valves for hose connections ( fresh water , brine return , brine outlet to pump ); 3 . 2 There must be reinforced forklift pockets for moving the salt tank and ; 3 . 3 Three hundred four ( 304 ) stainless steel is required for all metallic items , as it is the most corrosion - resistant of the three hundred ( 300 ) series of stainless steel . 4 LIST OF MINIMUM REQUIREMENTS FOR THE CONTROL SYSTEM : 4 . 1 Brine pumped from the salt tank must be monitored for salt concentration by a sensor which must monitor brine temperature and automatically compensate brine concentration accordingly . Any need for an operator to manually test the brine concentration is not acceptable ; 4 . 2 All brine exiting the salt tank must pass over the brine concentration sensor that monitors brine between zero point zero ( 0 . 0 ) and twenty - seven point zero ( 27 . 0 ) percent concentration by weight ; 4 . 3 The system must come complete with the ability to access the HMI ( operator interface ) via the Internet . The operator must be able to view the brine maker ’ s functions remotely ; 4 . 4 The system must include a two hundred fifty - six ( 256 )- color LCD touch - screen display , minimum seven and one - half ( 7 . 5 ) inches diagonal ; 4 . 5 The information on the display screen must include , but not be limited to : 4 . 5 . 1 Actual brine production concentration as a percentage of sodium chloride concentration by weight ; 4 . 5 . 2 Gallons of fresh water used to make brine ; |
Location
Country | United States of America (USA) |
State | Idaho |
Source
Source | Idaho Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Advanced Electronics, Steel, Water Supply and Storage, Broadband, Telecommunications |
Article published date | 2026-05-11 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Advanced Electronics tenders in United States of America
- RFP - Pro-Tem Hearing Examiner
- RFP - Thurston County Lake Management Districts Submerged Aquatic Vegetation Control
- Request/Notice for Qualifications for Biosolids Digester Fac...
- RFQ - Boston Harbor & Tamoshan Water & Sewer System Improvement Design, CP A053A&B, A511A&B
- RFP - Moderate Risk Waste transportation and disposition management of the County's moderate risk waste collected at HazoHouse
- RFP - Collection, Transportation, Recycling, and/or Disposal of Used Oil, Antifreeze, and Oil Filters
- FURNISHING DELIVERY AND INSTALLATION OF FLASHOVER SIMULATOR
- Nikon D5 Camera Upgrade for Existing DCS5 Alternative Light System
