logo

Lithium Trace Testing

Sector: Water Supply and Storage • Location: United Kingdom

Source: Find a Tender Service (UK)

Tender
Complete

The Bioresource and Energy Services team require non-intrusive tank capacity and sediment assessments of Anaerobic Digesters using Lithium chloride as a trace element to comply with Environmental Permitting (England & Wales) Regulations 2016 implementing the Industrial Emissions Directive (IED) every 5 years, which takes an integrated approach to controlling pollution to air, water, and land from

Status
Closed
Sector
Water Supply and Storage, Manufacturing (Industrial)
Location
United Kingdom
Updated
3 Nov 2026
Source
Find a Tender Service (UK)

ConstructChat

Ask ConstructChat about Lithium Trace Testing

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Lithium Trace Testing” is a tender record in Taiyo, linked to the Water Supply and Storage sector. It is issued for works, goods, or services related to United Kingdom.

Participants

Not available for this record.

Status

Original status

complete

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

The Bioresource and Energy Services team require non-intrusive tank capacity and sediment assessments of Anaerobic Digesters using Lithium chloride as a trace element to comply with Environmental Permitting (England & Wales) Regulations 2016 implementing the Industrial Emissions Directive (IED) every 5 years, which takes an integrated approach to controlling pollution to air, water, and land from industrial activities. We require the supplier to develop methodology to determine the effective volume of an anaerobic digester over a short period of testing time. The effective volume should be calculated from the lithium concentration once it reaches a steady and consistent level. The calculation for effective volume should be based on the dose of lithium chloride added, the concentration of lithium, and the background concentration established before the test is initiated. The results of the data should establish the following, and be presented within a report: Mixing efficiency Hydraulic retention time (HRT) Short‑circuiting or dead zones Sediment/grit accumulation The lithium chloride is to be dosed into each digester’s feed line, or other suitable position. Prior to the dosing of lithium chloride, initial samples should be taken from each digester in order to establish the background lithium concentrations. Samples should be taken from designated sampling points, identified during a pre-test site visit.

Location

Country

United Kingdom (UK)

Source

Source

Find a Tender Service (UK)

URL

More Details

Record type

Tender

Sector

Water Supply and Storage, Manufacturing (Industrial)

Article published date

2026-09-21

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender