Lithium Trace Testing
Sector: Water Supply and Storage • Location: United Kingdom
Source: Find a Tender Service (UK)
The Bioresource and Energy Services team require non-intrusive tank capacity and sediment assessments of Anaerobic Digesters using Lithium chloride as a trace element to comply with Environmental Permitting (England & Wales) Regulations 2016 implementing the Industrial Emissions Directive (IED) every 5 years, which takes an integrated approach to controlling pollution to air, water, and land from
- Status
- Closed
- Sector
- Water Supply and Storage, Manufacturing (Industrial)
- Location
- United Kingdom
- Updated
- 3 Nov 2026
- Source
- Find a Tender Service (UK)
ConstructChat
Ask ConstructChat about Lithium Trace Testing
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | complete |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The Bioresource and Energy Services team require non-intrusive tank capacity and sediment assessments of Anaerobic Digesters using Lithium chloride as a trace element to comply with Environmental Permitting (England & Wales) Regulations 2016 implementing the Industrial Emissions Directive (IED) every 5 years, which takes an integrated approach to controlling pollution to air, water, and land from industrial activities. We require the supplier to develop methodology to determine the effective volume of an anaerobic digester over a short period of testing time. The effective volume should be calculated from the lithium concentration once it reaches a steady and consistent level. The calculation for effective volume should be based on the dose of lithium chloride added, the concentration of lithium, and the background concentration established before the test is initiated. The results of the data should establish the following, and be presented within a report: Mixing efficiency Hydraulic retention time (HRT) Short‑circuiting or dead zones Sediment/grit accumulation The lithium chloride is to be dosed into each digester’s feed line, or other suitable position. Prior to the dosing of lithium chloride, initial samples should be taken from each digester in order to establish the background lithium concentrations. Samples should be taken from designated sampling points, identified during a pre-test site visit. |
Location
Country | United Kingdom (UK) |
Source
Source | Find a Tender Service (UK) |
URL |
More Details
Record type | Tender |
Sector | Water Supply and Storage, Manufacturing (Industrial) |
Article published date | 2026-09-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Water Supply and Storage tenders in United Kingdom
- District Heating Network Performance, Operational Monitoring and Planned Maintenance Services
- Swiftwater and Flood Boat Rescue Operator Training
- Sewer Mapping
- Technology Services Partner Framework (TSPF)
- Technology Services Partner Framework (TSPF)
- Provision and installation of burial vaults
- Diagnostic and Capital Equipment and Related Accessories and Services
- Wheal Jane - Reaction Chamber Mixing Tanks VSDs
