logo

Lla Levee Pump System Upgrade

Sector: Water Supply and Storage • Location: Lewiston, Idaho, United States of America

Source: SAM.gov

Tender
Sources Sought

This project will include removal and demo of existing pumps and pump motors, removal and demo of existing MCCs, and removal and demo if water level float sensing systems, including mercury switch technologies., Install new pumps and motors for all stations that have exceeded life cycle hours and /or are failing. Install new MCCs with soft starter tech and include an emergency diesel generator con

Status
Closed
Sector
Water Supply and Storage, Aerospace & Defense, Advanced Electronics, Power Generation (CCGT), Commercial, Residential
Location
Lewiston, Idaho, United States of America
Updated
3 Nov 2026
Source
SAM.gov

ConstructChat

Ask ConstructChat about Lla Levee Pump System Upgrade

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Lla Levee Pump System Upgrade” is a tender record in Taiyo, linked to the Water Supply and Storage sector. It is issued for works, goods, or services related to Lewiston, Idaho, United States of America.

Participants

Not available for this record.

Status

Original status

sources sought

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

This project will include removal and demo of existing pumps and pump motors, removal and demo of existing MCCs, and removal and demo if water level float sensing systems, including mercury switch technologies., Install new pumps and motors for all stations that have exceeded life cycle hours and /or are failing. Install new MCCs with soft starter tech and include an emergency diesel generator connector. Remove and replace existing alarms system with updated tech/cyber secure system, providing enhanced warning and emergency information, expediting response and safety. New PLCs will take inputs from water level sensors and MCC alarms and will send the alarms back to the operating building via radio. Some alarms are for high water and loss of power. The exact method for delivering these alarms to project to personnel during after hours is still being reviewed by UCIC (cyber center of expertise). The water level sensing system will feature Infra Red sensor and possible radar back-up to preclude freezing and other ambient weather conditions affecting the sensor accuracy. Completing this work will result in increased reliability during normal pumping operations and flood fighting events and improve flood risk management.

Original sector

Construction

Location

Country

United States of America (USA)

State

Idaho

City

Lewiston

Source

Source

SAM.gov

URL

More Details

Record type

Tender

Sector

Water Supply and Storage, Aerospace & Defense, Advanced Electronics, Power Generation (CCGT), Commercial, Residential

Article published date

2026-03-10

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender