logo

Local Electric Vehicle Infrastructure (LEVI) Concession

Sector: Electric Vehicles (EVs) • Location: United Kingdom

Source: Find a Tender Service (UK)

Tender
Active

Tender Opportunity: Local Electric Vehicle Infrastructure (LEVI) Concession Contract – Cornwall Council Cornwall Council invites bids for a 15-year concession contract (with an optional 1-year extension) to design, install, operate, and maintain a high-quality on-street electric vehicle charging network across Cornwall. This ambitious project is supported by up to £3,109,000 of Local Electric Vehi

Status
Bidding
Sector
Electric Vehicles (EVs), Hotel, Residential, Road, Automotive, Power Generation (CCGT)
Location
United Kingdom
Updated
3 Nov 2026
Source
Find a Tender Service (UK)

ConstructChat

Ask ConstructChat about Local Electric Vehicle Infrastructure (LEVI) Concession

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

4 Q
The tender “Local Electric Vehicle Infrastructure (LEVI) Concession” is a tender record in Taiyo, linked to the Electric Vehicles (EVs) sector. It is issued for works, goods, or services related to United Kingdom.

Participants

Not available for this record.

Status

Original status

active

Taiyo status

Bidding

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

Tender Opportunity: Local Electric Vehicle Infrastructure (LEVI) Concession Contract – Cornwall Council Cornwall Council invites bids for a 15-year concession contract (with an optional 1-year extension) to design, install, operate, and maintain a high-quality on-street electric vehicle charging network across Cornwall. This ambitious project is supported by up to £3,109,000 of Local Electric Vehicle Infrastructure (LEVI) funding and aims to deliver at least 2,000 publicly accessible charge points by December 2029. The Local Electric Vehicle Infrastructure (LEVI) funding is capped at a maximum of £3,109,000 any submission exceeding this figure will be deemed non-complaint and excluded from further evaluation. See tender documents for further details. All proposed charge points must be above-ground installations that comply with current UK safety, accessibility, and maintenance standards. Cornwall Council declared a climate emergency in 2019 and is committed to achieving carbon neutrality by 2030. Expanding EV infrastructure is central to this goal. Our Electric Vehicle Infrastructure (EVI) Strategy sets out a vision for a comprehensive, accessible, and reliable charging network that removes barriers to EV adoption for residents and visitors alike. Cornwall is the third largest unitary authority by population and a major tourist destination, with over 4 million overnight visits annually. Nearly two-thirds of residents live in rural or dispersed communities, making on-street and near-home charging essential. Strategic Objectives · Deliver a well-maintained, reliable network with excellent uptime and customer experience. · Ensure affordable and transparent pricing, aligned with prevailing market rates. · Provide inclusive access, meeting PAS 1899 accessibility standards wherever practicable. · Support social value commitments, including local employment and zero-emission maintenance vehicles. · Guarantee green energy supply for all charge points. Why Cornwall? · A unique geography with urban, rural, and coastal communities. · Strong tourism economy driving seasonal demand. · A clear strategy supporting sustainable transport and EV uptake. Join us in shaping a cleaner, greener future for Cornwall. This is a rare opportunity to deliver a transformative EV infrastructure programme that supports residents, visitors, and businesses while contributing to national decarbonisation goals. There is a compulsory financial contribution of £60,000 from 1 April 2028, which the Service Provider agrees to pay the Authority annually for the duration of the contract. This financial contribution will be index-linked for annual increase from the anniversary of the first payment to increases in the Retail Price Index (RPI), regardless of income generated. Please refer to the Statement of Requirements (Specification) and the Draft Contact for full details. This opportunity includes a requirement for 2,000 Charge points to be installed, commissioned and operational by 31st December 2029, any submission which falls below this figure will be deemed non-compliant and excluded from further evaluation. See tender documents for further details.

Budget

Location

Country

United Kingdom (UK)

Source

Source

Find a Tender Service (UK)

URL

More Details

Record type

Tender

Sector

Electric Vehicles (EVs), Hotel, Residential, Road, Automotive, Power Generation (CCGT)

Article published date

2026-09-21

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender