Lock Foundation And Site Preparation For Lock And Dam 25 Navigation Ecosystem Sustainability Program (Nesp)
Sector: Water Supply and Storage • Location: Lock and Dam 25, Winfield, MO 63389
Source: SAM.gov
The U. S. Army Corps of Engineers, St. Louis District, is seeking a firm to furnishing all equipment, labor, operators, supervision/site superintendent, quality control, supplies, materials, and incidentals necessary to satisfactorily perform and provide construction activities of lock foundation and site preparation work. The lock foundation work establishes the lock wall and floor foundation. It
- Status
- Closed
- Sector
- Water Supply and Storage, Residential, Aerospace & Defense, Road, Hydro, Commercial
- Location
- United States of America
- Updated
- 3 Nov 2026
- Source
- SAM.gov
ConstructChat
Ask ConstructChat about Lock Foundation And Site Preparation For Lock And Dam 25 Navigation Ecosystem Sustainability Program (Nesp)
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | presolicitation |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The U. S. Army Corps of Engineers, St. Louis District, is seeking a firm to furnishing all equipment, labor, operators, supervision/site superintendent, quality control, supplies, materials, and incidentals necessary to satisfactorily perform and provide construction activities of lock foundation and site preparation work. The lock foundation work establishes the lock wall and floor foundation. It consists of excavation and disposal of existing scour protection riprap that was part of previous scour hole emergency repair, dredging of sand fill, placement of sand fill in the proposed lock foundation, and placement of riprap berm. Work also includes the construction of a separator wall that will separate the river side riprap berm from the dredged sand that will be placed as foundation material for the future river wall monoliths and lock floor. The separate wall will be a sheet pile wall braced with piles. This effort also includes a deflector on the downstream side of the dam to route water flowing through the tainter gated dam adjacent to the river walls around the sheet pile separator wall. For the site preparation work, additional dredge borrow will be placed upland for a future staging and laydown area and a sanitary outfall pipe will be installed. ---- Presolicitation Synopsis Update 0001 - update the POP information. |
Original sector | Construction |
Location
Country | United States of America (USA) |
Source
Source | SAM.gov |
URL |
More Details
Record type | Tender |
Sector | Water Supply and Storage, Residential, Aerospace & Defense, Road, Hydro, Commercial |
Article published date | 2026-01-23 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Water Supply and Storage tenders in Lock and Dam 25, Winfield, MO 63389
- Lock Foundation And Site Preparation For Lock And Dam 25 Navigation Ecosystem Sustainability Program (Nesp)
- Lock Foundation And Site Preparation For Lock And Dam 25 Navigation Ecosystem Sustainability Program (Nesp)
- Lock Foundation And Site Preparation For Lock And Dam 25 Navigation Ecosystem Sustainability Program (Nesp)