logo

Lock Foundation And Site Preparation For Lock And Dam 25 Navigation Ecosystem Sustainability Program (Nesp)

Presolicitation · Lock and Dam 25, Winfield, MO 63389

Source: SAM.gov

Tender
Presolicitation

The U. S. Army Corps of Engineers, St. Louis District, is seeking a firm to furnishing all equipment, labor, operators, supervision/site superintendent, quality control, supplies, materials, and incidentals necessary to satisfactorily perform and provide construction activities of lock foundation and site preparation work. The lock foundation work establishes the lock wall and floor foundation. It

Status
Closed
Sector
Water Supply and Storage, Hydro, Aerospace & Defense, Road, Commercial, Residential
Location
United States of America
Updated
3 Nov 2026
Source
SAM.gov

ConstructChat

Ask ConstructChat about Lock Foundation And Site Preparation For Lock And Dam 25 Navigation Ecosystem Sustainability Program (Nesp)

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Lock Foundation And Site Preparation For Lock And Dam 25 Navigation Ecosystem Sustainability Program (Nesp)” is a tender record in Taiyo, linked to the Water Supply and Storage sector. It is issued for works, goods, or services related to Lock and Dam 25, Winfield, MO 63389.

Participants

Not available for this record.

Status

Original status

presolicitation

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

The U. S. Army Corps of Engineers, St. Louis District, is seeking a firm to furnishing all equipment, labor, operators, supervision/site superintendent, quality control, supplies, materials, and incidentals necessary to satisfactorily perform and provide construction activities of lock foundation and site preparation work. The lock foundation work establishes the lock wall and floor foundation. It consists of excavation and disposal of existing scour protection riprap that was part of previous scour hole emergency repair, dredging of sand fill, placement of sand fill in the proposed lock foundation, and placement of riprap berm. Work also includes the construction of a separator wall that will separate the river side riprap berm from the dredged sand that will be placed as foundation material for the future river wall monoliths and lock floor. The separate wall will be a sheet pile wall braced with piles. This effort also includes a deflector on the downstream side of the dam to route water flowing through the tainter gated dam adjacent to the river walls around the sheet pile separator wall. For the site preparation work, additional dredge borrow will be placed upland for a future staging and laydown area and a sanitary outfall pipe will be installed. ---- Presolicitation Synopsis Update 0001 - update the POP information.

Original sector

Construction

Location

Country

United States of America (USA)

Source

Source

SAM.gov

URL

More Details

Record type

Tender

Sector

Water Supply and Storage, Hydro, Aerospace & Defense, Road, Commercial, Residential

Article published date

2026-04-15

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender