logo

Lon D Wright Power Plant Unit # 8 Boiler Chemical Cleaning

The scope, dates and status of this tender. A free account opens every field.

Source: Nebraska Purchasing Group

Tender
Closed

The Contractor shall provide the materials and labor as herein specified for a complete chemical cleaning of the furnace water wall tubes and headers and the economizer tubes and headers of Unit No . 8 675 , 000 pph boiler . The following is a general description of the work which shall be included bu

Status
Closed
Sector
Water Supply and Storage, Chemical (Industrial), Hydrogen, Power Generation (CCGT), Steel, Manufacturing (Industrial)
Location
Nebraska, United States of America
Updated
3 Nov 2026
Source
Nebraska Purchasing Group

ConstructChat

Ask ConstructChat about Lon D Wright Power Plant Unit # 8 Boiler Chemical Cleaning

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Lon D Wright Power Plant Unit 8 Boiler Chemical Cleaning” is a tender record in Taiyo, linked to the Water Supply and Storage sector. It is issued for works, goods, or services related to Nebraska, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

The Contractor shall provide the materials and labor as herein specified for a complete chemical cleaning of the furnace water wall tubes and headers and the economizer tubes and headers of Unit No . 8 675 , 000 pph boiler . The following is a general description of the work which shall be included but not limited to as a part of this Contract . 1 . 3 . 1 Obtain necessary dimensions and data during the site visit ( s ). 1 . 3 . 2 Provide suitable solvent , inhibitor , passivator and / or other chemicals necessary to chemically clean the boiler in accordance with the best available technology . The Contractor will bring at least 50 % extra chemicals to the site so that a sufficient supply of chemicals is always readily available in the event that deposit levels prove higher than anticipated . 1 . 3 . 3 The tetra ammonium EDTA ( ethylenediaminetetraacetic acid ) cleaning process shall be the basis of the base bid . Another cleaning process may be proposed by the bidder and submitted as an alternate bid . 1 . 3 . 4 No acid cleaning processes shall be permitted . 1 . 3 . 5 No anhydrous ammonia shall be permitted on the power plant site for use by this Contractor . 1 . 3 . 6 Provide all necessary pumping equipment , piping , valves , temporary storage tanks , safety equipment and other appurtenances to inject the chemical solutions into the boiler and recirculate and recover the expended fluids and rinses . 1 . 3 . 7 Provide at least one service supervisor , one chemist and one equipment technician per shift over the entire chemical cleaning periods . 1 . 3 . 8 Provide a detailed chemical clean plan which includes a list of all preparations necessary to accomplish the chemical cleaning with the bid proposal for Owner ' s later approval prior to start of work . 1 . 3 . 9 Monitor the ongoing progress of the cleaning processes and advise Owner ' s Plant Superintendent or designated representative of such progress and any changes in the cleaning process or schedule . A portable analytical laboratory that is fully equipped shall be provided onsite during the boiler chemical clean to monitor pH , chemical concentration and dissolved metals in the cleaning solvent . Include all processes in Contractor ' s Boiler Cleaning Report to be submitted within 30 calendar days after completion of all onsite work . 1 . 3 . 10 Determine when the cleaning is completed and notify Owner ' s Plant Superintendent or designated representative of such status . 1 . 3 . 11 Perform passivation , draining and rinsing of boiler coordinating such efforts with the plant operating supervisors on duty at the time . 1 . 3 . 12 Provide proper disposal of Boiler Chemical Cleaning Waste . 1 . 3 . 13 Accompany Owner ' s Plant Superintendent or designated representative ( s ) during the post cleaning inspection of the boiler . 1 . 3 . 14 Remove all temporary equipment , piping and other such materials except for piping inside the plant which can be effectively utilized , in the opinion of Owner ' s Plant Superintendent during future chemical cleaning of these boilers . Contractor provided piping , valves and appurtenances which shall remain in place shall have pressure / temperature ratings equal to or greater than the existing piping which it is adjoining . All permanently installed valves shall be at least 2 " in size and of suitable pressure class , steel body with butt or socket welding ends as approved by the Owner . 1 . 3 . 15 Provide a written report to the Owner and the Engineer describing the work performed including , but not limited to , the boiler water chemistry at the completion of each cleaning stage , the quantity of each chemical used during each cleaning stage and the total fluid quantity ( gallons ) injected into the boiler for incineration as further described in Paragraph E . 34 for submittal requirements .

Location

Country

United States of America (USA)

State

Nebraska

Source

Source

Nebraska Purchasing Group

URL

More Details

Record type

Tender

Sector

Water Supply and Storage, Chemical (Industrial), Hydrogen, Power Generation (CCGT), Steel, Manufacturing (Industrial)

Article published date

2026-04-29

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender