logo

Longitudinal road markings Innlandet 2027-2029

The scope, dates and status of this tender. A free account opens every field.

Source: TED Europa

Tender
Contract Notice

The nature and scope of the work

The works include longitudinal road markings, as well as milling for road marking.

Innlandet County currently has one preliminary mark, but may require periodical assistance with preliminary marking.

The contract area is the entire area of Innlandet County.

In the event of contradictions between information in the tender management tool and the attached documen

Status
Closed
Sector
Road
Location
Norway
Updated
3 Nov 2026
Source
TED Europa

ConstructChat

Ask ConstructChat about Longitudinal road markings Innlandet 2027-2029

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Longitudinal road markings Innlandet 2027-2029” is a tender record in Taiyo, linked to the Road sector. It is issued for works, goods, or services related to Norway.

Participants

Not available for this record.

Status

Original status

contract notice

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

The nature and scope of the work The works include longitudinal road markings, as well as milling for road marking. Innlandet County currently has one preliminary mark, but may require periodical assistance with preliminary marking. The contract area is the entire area of Innlandet County. In the event of contradictions between information in the tender management tool and the attached documents (annex/annex), information in the documents (annex/annexes) applies before information in the tender management tool. The contract period is 01.01.2027-31.12.2029. The builder and contractor have the mutual option to extend the contract for 1+1 year. Mutual option means that both parties must agree to an option/extension of the existing contract on the existing terms. It will not be possible to renegotiate the contract in connection with the exercise of the option. Any extension of the contract shall be agreed within 6 months before the ordinary operations period expires. The scopes given in chapter D (processes) and chapter E (quantity form) apply per year and are adjustable in accordance with NS 8406 point 19.1, fourth paragraph. The amounts are estimated on the basis of an average of previous years' experience. The contractor must reckon on large variations in the amount performed, as this is situational and, among other things, affected by unpredictable variables such as weather situation, wear, damage damage and financial awards.

Original sector

Construction work, Repair and maintenance services, Construction work, Construction work, Construction work, Construction work, Transport equipment and auxiliary products to transportation, Construction work, Construction work, Construction work

Location

Country

Norway

Source

Source

TED Europa

URL

More Details

Record type

Tender

Sector

Road

Article published date

2026-10-27

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender