LOT 15A – DISTRIBUTION AND COLLECTION FACILITY
The scope, dates and status of this tender. A free account opens every field.
Source: Georgia Purchasing Group
The City of Gainesville Department of Water Resources ( the City ) requests Proposals from Construction Management at Risk ( CMAR ) firms for the construction of Gainesville 85 Business Park Lot 15A Distribution and Collection Facility . The City intends to build a new Distribution & Collection Facility located in
- Status
- Closed
- Sector
- Natural Gas, Waste Processing and Treatment, Water Supply and Storage, Commercial, Power Transmission, Power Generation (CCGT)
- Location
- Georgia, United States of America
- Updated
- 3 Nov 2026
- Source
- Georgia Purchasing Group
ConstructChat
Ask ConstructChat about LOT 15A – DISTRIBUTION AND COLLECTION FACILITY
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The City of Gainesville Department of Water Resources ( the City ) requests Proposals from Construction Management at Risk ( CMAR ) firms for the construction of Gainesville 85 Business Park Lot 15A Distribution and Collection Facility . The City intends to build a new Distribution & Collection Facility located in Gainesville , Georgia at the Gainesville 85 Business Park , Lot 15A , and is considering the services of a CMAR firm to manage the construction , provide technical review during the pre - construction period , and provide cost evaluation assistance to the architectural and engineering team for facility construction . The CMAR will assume responsibility for project construction cost by issuing a guaranteed maximum price ( GMP ). The GMP will be a contractual obligation . The Construction Manager at Risk ( CMAR ) will be under contract to supply pre - construction services and subsequently , by change order , construction services ( under the Agreement ) to complete the project and place the City in occupancy of the project in a “ turnkey ” fashion . The City has contracted with the Architect separately from the CMAR . Site Civil work will include only rough grading , sanitary sewer , water and stormwater , and will be design - bid - build by the City under a separate contract in early 2026 . Close coordination will be required . The CMAR will be responsible for installation of all natural gas , electric , and fiber / communications onsite , as well as building specific components of all utilities ( building electric , plumbing , roof drain systems , etc .), and all utility connections from the buildings to the on - site infrastructure that is installed by the site civil contractor ( sanitary sewer , water and stormwater ). The CMAR will also be responsible for finish work including finish grading , curb and gutter , sub - base and paving , permanent fencing , gates , lighting landscaping , permanent signage , and other hardscaping . Once a GMP is agreed upon between the City and the CMAR , the CMAR may be issued a change order for the amount of the GMP and will be “ at risk ” for project price , project schedule , and completion of all construction as set forth in the Contract Documents . The CMAR shall hold all trade contracts and trade supplier contracts . The CMAR will develop an overall final project schedule , which will be a contractual obligation . In addition , the CMAR will be responsible for methods of construction , safety , and the scheduling and coordination of the work of all construction and miscellaneous contracts required for completion of the project within its established budget and schedule |
Location
Country | United States of America (USA) |
State | Georgia |
Source
Source | Georgia Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Natural Gas, Waste Processing and Treatment, Water Supply and Storage, Commercial, Power Transmission, Power Generation (CCGT) |
Article published date | 2026-05-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Natural Gas tenders in United States of America
- Natural Gas Piping Modifications
- Southeast Treatment Plant (SEP) Biogas Utilization Project
- Plumbing Services Maintenance and Repair at All VTA Facilities
- RNG Plant HVAC Preventative and Emergent Maintenance Services
- NORTHERN RECYCLING FACILITY ELECTRICAL UPGRADES
- Compressed Natural Gas for Vehicle Fuel CNG Fuel
- Southeast Water Pollution Control Plant Biogas Utilization P...
- Oceanside Water Pollution Control Plant Digester Gas Utiliza...