logo

Louth Street Niagara Region Transit HVAC Upgrades

The scope, dates and status of this tender. A free account opens every field.

Source: Niagara Region

Tender
Open

This Request for Proposal (the “RFP”) is an invitation by the Regional Municipality of Niagara (“Niagara Region”) to prospective proponents to submit proposals for 2026-RFP-124 Louth Street Niagara Region Transit HVAC Upgrades, as further described in Section A of the RFP Particulars (Appendix B) (the “Deliverables”). The Niagara Regional Transit building is located at 2012 First Street Louth in S

Status
Bidding
Sector
Advanced Electronics, Road, Government, Commercial
Location
Canada
Updated
3 Nov 2026
Source
Niagara Region

ConstructChat

Ask ConstructChat about Louth Street Niagara Region Transit HVAC Upgrades

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Louth Street Niagara Region Transit HVAC Upgrades” is a tender record in Taiyo, linked to the Advanced Electronics sector. It is issued for works, goods, or services related to Canada.

Participants

Not available for this record.

Status

Original status

open

Taiyo status

Bidding

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

This Request for Proposal (the “RFP”) is an invitation by the Regional Municipality of Niagara (“Niagara Region”) to prospective proponents to submit proposals for 2026-RFP-124 Louth Street Niagara Region Transit HVAC Upgrades, as further described in Section A of the RFP Particulars (Appendix B) (the “Deliverables”). The Niagara Regional Transit building is located at 2012 First Street Louth in St Catharines, ON. The building was built in 1990 with additions in 2016 and 2023 for a total footprint of approximately 88,985 sq ft.The buildings’ building automation system is made up of 10 Carrier Open XP controllers with 3 I/O expansion boards connected on a BACnet MS/TP network. The system programming is currently inaccessible to the building operations team. These controllers and I/O boards control: 9 MUA gas fired units (fan and heating control) Zone gas sensors (NO2 and CO) Space temperature Exhaust fans The successful proponent is to replace the Carrier Open XP controllers with new open source BACnet controllers, adding a building JACE 9000, and connecting the building BAS system to the Regions BAS Supervisor. In addition to the supply and installation of this new equipment the successful proponent will be responsible for the programming, graphics, proxy points and alarms. The building contains two (2) Carrier Roof top units (RTUs), as well as an ERV (Metasys controls), and two (2) Trane heat pump RTU’s that will need to be included into the new BAS system. The successful proponent will need to work with Region staff to develop the building sequence of operation for the MUA’s and exhaust fans. The final sequence of operation must be stamped by a professional engineer.

Location

Country

Canada

Source

Source

Niagara Region

URL

More Details

Record type

Tender

Sector

Advanced Electronics, Road, Government, Commercial

Article published date

2026-11-01

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender