Lower Alemany Area Stormwater Improvements Project

The scope, dates and status of this tender. A free account opens every field.

Source: California Purchasing Group

Tender
Closed

2 . 2 Project Needs The Lower Alemany area is part of the Islais Creek watershed that has historically experienced flooding during intense storm events . Under current conditions , the existing system is unable to adequately convey wet weather flows generated by a Level of Service ( LOS ) five - year , three - hou

Status
Closed
Sector
Water Supply and Storage, Waste Processing and Treatment, Tunnel, Manufacturing (Industrial), Road
Location
California, United States of America
Updated
3 Nov 2026
Source
California Purchasing Group

ConstructChat

Ask ConstructChat about Lower Alemany Area Stormwater Improvements Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Lower Alemany Area Stormwater Improvements Project” is a tender record in Taiyo, linked to the Water Supply and Storage sector. It is issued for works, goods, or services related to California, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

2 . 2 Project Needs The Lower Alemany area is part of the Islais Creek watershed that has historically experienced flooding during intense storm events . Under current conditions , the existing system is unable to adequately convey wet weather flows generated by a Level of Service ( LOS ) five - year , three - hour storm event , defined as a storm producing approximately 1 . 3 inches of rainfall with a statistically derived peak intensity . On November 2021 , A Clean Up and Abatement Order ( CAO ) was established between the California Regional Water Quality Control Board and SFPUC to manage stormwater during the LOS storm and manage inundation risks to public and private properties , transportation corridors , and downstream sewer facilities . The Project proposes a new auxiliary sewer intended to intercept and bypass excess wet weather flows , therefore reduce flooding impacts in the Lower Alemany area . 3 . Project Description 3 . 1 Overall Scope and Alignment The project is to construct the Alemany Auxiliary Sewer , an approximately 1 . 4 - mile - long conveyance designed to manage wet weather flows during major storm events . The alignment primarily follows Alemany Boulevard , Gaven Street ( south of Interstate 280 ), and Boutwell Street ( east of the Interstate 280 / U . S . Highway 101 interchange ). The auxiliary sewer will connect upstream to the existing Alemany Sewer and downstream to the Industrial Sewer and Islais Creek Transport / Storage system , integrating new infrastructure with the City ’ s existing combined sewer system . 3 . 2 Tunnel and Shaft Construction A significant portion of the auxiliary sewer will be constructed as a deep tunnel . The project includes approximately 6 , 320 linear feet of tunnel with an internal diameter of 10 feet . Tunnel construction will be supported by three primary construction shafts , which will later be converted into permanent vent shafts . Shaft diameters will be as large as 45 feet , with depths reaching up to approximately 90 feet in mixed soil and rock conditions . The tunnel is anticipated to be constructed using either a tunnel boring machine ( TBM ) with precast segmental lining or pipe jacking methods , depending on contractor means and methods . These approaches are intended to minimize surface disruption while providing a durable and watertight conveyance structure suitable for long - term operation . 3 . 3 Box Sewer Construction In addition to the deep tunnel , the project includes approximately 1 , 000 linear feet of box sewer constructed using cut - and - cover construction methods . This section will consist of a single box sewer measuring approximately 7 feet in height by 13 feet in width inside dimensions . The box sewer will be located along Boutwell Street and Industrial Street and will provide a transition between the tunnel system and downstream connection structures . Cut - and - cover construction will require careful coordination and relocation of existing utilities , relocation of the San Francisco MUNI transit overhead contact system , traffic control measures , and surface restoration , including roadway repaving and replacement of affected streetscape elements . 3 . 4 Diversion and Connection Structures Upstream improvements include modifications to the existing Alemany Sewer to enable diversion of wet weather flows into the new auxiliary sewer . This work includes construction of a new diversion chamber and structural reinforcement of the existing sewer to allow creation of new openings while maintaining system integrity . As for downstream improvements , the project includes reconstruction of portions of the existing Barneveld - Industrial Connection Structure ( BICS ) located on Industrial Street . This work will allow the auxiliary sewer to discharge and blend wet weather flows into the existing combined sewer system . Structural upgrades to the BICS include reinforcing the existing roof slab with carbon fiber materials to meet load and durability requirements . 5 . 1 Questions Please provide a response to the following questions : 1 . Would your firm be interested in bidding on this project ? Yes / No a . If yes to Question No . 1 above , rate your interest in this Project from 1 ( minimal interest ) to 5 ( high interest ) b . If no to Question No . 1 above , please state why . 2 . Would your firm be able to bid on this project if the project is advertised in around April 2026 , with notice to proceed around February 2027 ? Yes / No a . If no to Question No . 2 above , what timeline may be more appealing for your firm to be interested in bidding ? 3 . Are there project elements that the SFPUC should address prior to solicitation that would make the project more attractive ? 4 . Are there any critical concerns and risk about this project ? What portion of the project do you see carrying the highest risk ? 5 . Are there specific contract terms ( e . g ., risk allocation , incentives , liquidated damages ) that would significantly affect your interest in bidding ? 6 . Are there any other changes that would make this project more attractive to bidders ?

Location

Country

United States of America (USA)

State

California

Source

Source

California Purchasing Group

URL

More Details

Record type

Tender

Sector

Water Supply and Storage, Waste Processing and Treatment, Tunnel, Manufacturing (Industrial), Road

Article published date

2026-03-27

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender