LP Wilson BOE Restroom Upgrades
Sector: Water Supply and Storage • Location: Connecticut, United States of America
Source: Connecticut Purchasing Group
Responsibilities for proper handling of Hazardous Material will be as follows : Monitoring Abatement ; Temperature controls will be provided by Automated Logic and will be quoted directly to the Town . Any demolition and Installation of temperature controls will be coordinated with Automated Logic and managed by
- Status
- Closed
- Sector
- Water Supply and Storage, Chemical (Industrial), Manufacturing (Industrial), Power Generation (CCGT), Commercial
- Location
- Connecticut, United States of America
- Updated
- 3 Nov 2026
- Source
- Connecticut Purchasing Group
ConstructChat
Ask ConstructChat about LP Wilson BOE Restroom Upgrades
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Responsibilities for proper handling of Hazardous Material will be as follows : Monitoring Abatement ; Temperature controls will be provided by Automated Logic and will be quoted directly to the Town . Any demolition and Installation of temperature controls will be coordinated with Automated Logic and managed by the Contractor . Responsibilities for Temperature Controls will be as follows : Install Control Valves Furnish and install 120 - volt circuit for Controls with . Figure one per room . The Contractor will follow the following sequence : • Work area preparation for abatement activities ; • Abatement of scope of work here ; • Final visual inspection and / or re - occupancy air clearance testing following completion of abatement activities ; • Removal of regulated work area containment barriers . 3 Work Area Preparation 3 . 1 General A . Provide Ground Fault Circuit Interrupter ( GFCI ) devices , temporary power , and temporary lighting installed in compliance with the applicable electrical codes . A State of Connecticut licensed electrician shall make all installations . B . Provide temporary water for use during abatement as well as decontamination of equipment and personnel . C . Deactivate and / or isolate heating , ventilation , and air conditioning ( HVAC ) air systems or zones to prevent contamination and fiber dispersal to non - work areas of the building . D . Provide a temporary secured opening for exhausting High Efficiency Particulate Air ( HEPA ) filtered negative air exhaust from the work area to an exterior location away from persons who may potentially be outside of the building . 3 . 2 For Interior Abatement Activities A . Install a critical barrier of 6 mil polyethylene sheeting . Seal edges with glue and tape to form an airtight barrier isolating the work area . B . Construct a contiguous worker decontamination unit as required in Section 4 . C . Install caution tape and “ Asbestos Warning ” signs on critical barriers creating a regulated area . Workers within the regulated area shall be restricted to properly trained , licensed personnel afforded the appropriate Personal Protective Equipment ( PPE ). |
Location
Country | United States of America (USA) |
State | Connecticut |
Source
Source | Connecticut Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Water Supply and Storage, Chemical (Industrial), Manufacturing (Industrial), Power Generation (CCGT), Commercial |
Article published date | 2026-03-27 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
