LWS N 56th Street Pump Station Motor Control Center Procurement
The scope, dates and status of this tender. A free account opens every field.
Source: Nebraska Purchasing Group
D . ROCK EXCAVATION Rock Excavation shall be excavation in solid rock formations in the original bed or welldefined ledges more than 12 ” in thickness , or detached solid masses of stone more than 1 / 2 cubic yard in volume which cannot be excavated , loosened or removed by any process other than by dri
- Status
- Closed
- Sector
- Road, Water Supply and Storage
- Location
- Nebraska, United States of America
- Updated
- 3 Nov 2026
- Source
- Nebraska Purchasing Group
ConstructChat
Ask ConstructChat about LWS N 56th Street Pump Station Motor Control Center Procurement
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | D . ROCK EXCAVATION Rock Excavation shall be excavation in solid rock formations in the original bed or welldefined ledges more than 12 ” in thickness , or detached solid masses of stone more than 1 / 2 cubic yard in volume which cannot be excavated , loosened or removed by any process other than by drilling or by the use of pneumatic equipment . No soft or disintegrated rock , or rock that has been broken or previously blasted , or broken stone in rock fill or elsewhere , will be classified as rock excavation . Unless indicated in the proposal , payment will be made for " Rock Excavation " as an Extra Work item . E . HAUL OR OVERHAUL Unless specified in the proposal , no payment will be made for " Haul " or " Overhaul ." The cost of hauling material to or from the Work regardless of distance shall be considered subsidiary to and a part of the applicable Contract bid price . F . CLEAN UP The Contractor shall at all times keep the site of the Work free from accumulations of waste materials or rubbish caused by his employees or Work , and at the completion of the Work he shall remove all rubbish from and about the Work and all tools , equipment , scaffolding and surplus materials and shall leave the site clean and ready for use . All sewers , conduits , pipes and appurtenances , and all tanks , pump wells , chambers , buildings and other structures shall be kept clean during construction ; and as the Work or any part thereof approaches completion , the Contractor shall systematically and thoroughly clean and make any needed repairs to them . He shall furnish , at his own expense , suitable tools and labor for removing all water and cleaning out all dirt , mortar and foreign substances . The City ’ s Project Manager will not approve the final estimate of any portion of the Work until after Final Completion is achieved and the Work found satisfactory . The City may remove or cause the removal of the rubbish , surplus materials , and traffic control devices and deduct the cost from the final estimate or charge the cost to the Contractor if the cleanup is not properly performed by the Contractor within 3 business days of written notice from the City ’ s Project Manager . |
Location
Country | United States of America (USA) |
State | Nebraska |
Source
Source | Nebraska Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Road, Water Supply and Storage |
Article published date | 2026-04-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Road tenders in United States of America
- RFP - Pro-Tem Hearing Examiner
- NEW TIRES RETREADS AND TIRE SERVICES
- Professional Construction Engineering and Inspection CEI Services for the Williamson Boulevard Widening
- Lincoln Avenue Wascher to Killarney Preliminary Engineering Section 220065800PV
- KilleenFort Hood Regional Airport KFHRA Terminal Apron Rehabilitation Phase II
- IFB 947902022JM Screening 10 Asphalt Filter Stone 8 Granite Double Washed
- IFB 914202022AM Street Sweeper Parts and Brooms
- IFB 843402021AB Hay Alfalfa and Wheat Straw for Norfolk Zoo
