MAIN BLOCK 4-7 Hawkins Road - 2025-2026 Planned roof programme - Pitched Roof
Complete · United Kingdom
Source: Open Contracting Data Standard (OCDS)
Project: The refurbishment of the main hipped roof NB: All roofing work to be carried out by an NFRC accredited contractor & must be able to self-certify via the competent roofing scheme. As part of contractor pre-survey, contractor should identity any soffit and live extractor fan vents which will need to be disconnected and reconnected during works All flats must be checked to see if there
- Status
- Closed
- Sector
- Telecommunications, Cement, Steel, Forest Products and Packaging, Road, Commercial
- Location
- United Kingdom
- Updated
- 3 Nov 2026
- Source
- Open Contracting Data Standard (OCDS)
ConstructChat
Ask ConstructChat about MAIN BLOCK 4-7 Hawkins Road - 2025-2026 Planned roof programme - Pitched Roof
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | complete |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Project: The refurbishment of the main hipped roof NB: All roofing work to be carried out by an NFRC accredited contractor & must be able to self-certify via the competent roofing scheme. As part of contractor pre-survey, contractor should identity any soffit and live extractor fan vents which will need to be disconnected and reconnected during works All flats must be checked to see if there are any live gas appliances, wood burning/multi fuel stoves or open fires still in use prior to the removal of any chimney stacks. Evidence shall be provided to the Aster Surveyor who will be able to authorise this phase of work if necessary. Isolation of flues (priced separately) in line with gas protocols, removals (priced separately) to be discussed and review with client. Aster Surveyor to advise with any blocking up and venting work as the scope of work will need to be agreed with the leaseholder/s or resident/s in advance. Erect tubular steel scaffolding with required lifts to such elevations, including suitable access for removing the shared chimney and dismantle on completion. All scaffolding to be measured against the face of the building and to include the lift heights for a specific work type and trade. Allow for repositioning of existing satellite dishes & T.V. aerials, including re-instating them and testing the signal both inside and outside of a property. NB: The existing T.V. aerials if live will need to be reinstated inside the loft space Remove existing tiles, battens, felt, safely lower to ground level and remove from site. Allow for clearing all debris from the eaves and behind the skeiling/sloping ceiling detail, then insulate using a 50-75mm thick PIR insulation board with a foil backing ensuring that an adequate air gap's left for ventilation. Allow for the supply and install new structural timber to rafters and ridge sections including noggins to fill in any collapsed verge ladder or rotten rafter (Provisional sum included in pricing document but only to be spent with the agreement of Aster surveyor) The contractor must allow for accessing the loft spaces in top floor flats to see if the gable ends have been strapped to provide lateral stability. Allow for supplying and installing Simpson Strong-Tie retrofit restraint straps. (To be installed as per the manufacturers instructions). Supply and fix new Permavent Apex breathable membrane to the entire roof area and fix new 38 x 25 mm treated and Bs coded timber battens to rafters. Supply and install new Redland Duoplain Concrete Interlocking roof tiles including new dry fixed Redland Universal Angle Ridge. Colour to match existing, to be agreed with the contract surveyor prior to ordering. All materials to be installed as per manufacturer’s instructions. Supply and fix eaves support trays G1281 by Manthorpe, including rafter roll fitted as per manufacturer’s instructions. To all roofs in contract. Check the condition of the existing aluminium Ogee guttering and if serviceable clean and check the existing fixtures and fittings are secure and that it doesn’t leak. (The RWGs can remain insitu if found to be in good working order). Allow for supplying and fitting new deep flow guttering including downpipes, connections and associated fixtures & fittings to flat block. Test guttering for leaks and adequate falls. Deliver free of dirt or imperfections. All waste material and debris will be removed from site. The contractor is to leave the properties and surrounding areas etc clean and clear to original condition. Wash down windows, doors, and existing/new PVCu Fascia's/soffits on completion to remove dirt & debris caused by roofing works. |
Location
Country | United Kingdom (UK) |
Source
Source | Open Contracting Data Standard (OCDS) |
URL |
More Details
Record type | Tender |
Sector | Telecommunications, Cement, Steel, Forest Products and Packaging, Road, Commercial |
Article published date | 2026-04-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Telecommunications tenders in United Kingdom
- DLS Case Management IT Refresh
- 360 Tenant Experience Portal
- Technology Services Partner Framework (TSPF)
- Technology Services Partner Framework (TSPF)
- Information for consent forms
- Contract for Legacy Hardware Maintenance Contract
- CivTech 11.4 - How can innovation and technology improve things for people with long term health conditions starting with Musculoskeletal conditions, so they can engage with life and work as fully as possible?
- Installation of CVIM Generator Back Up Power
