Main Lobby Storefront Replacement
Sector: Rail • Location: Mississippi, United States of America
Source: Mississippi Purchasing Group
Cherokee Nation Entertainment , LLC ( CNE ) is requesting proposals from qualified contractors to complete the work herein . The Gold Strike Hotel and Casino is a 1 . 3M square foot facility with over 1 , 100 hotel rooms , 1 , 000 + electronic games , 58 table games , dining venues , meeting spaces and stage venues .
- Status
- Closed
- Sector
- Rail, Hotel, Power Generation (CCGT)
- Location
- Mississippi, United States of America
- Updated
- 3 Nov 2026
- Source
- Mississippi Purchasing Group
ConstructChat
Ask ConstructChat about Main Lobby Storefront Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Cherokee Nation Entertainment , LLC ( CNE ) is requesting proposals from qualified contractors to complete the work herein . The Gold Strike Hotel and Casino is a 1 . 3M square foot facility with over 1 , 100 hotel rooms , 1 , 000 + electronic games , 58 table games , dining venues , meeting spaces and stage venues . This project is limited to the replacement of the exterior and interior main entry storefront door system . The storefront door system is comprised of an exterior set and an interior set creating an entry vestibule . Both utilize breakaway , automatic sliding doors , manual push / pull swing doors , and power assist push / pull swing doors . All swing doors are 3070 and the sliders are 6070 with Stanley door sensors and operators . The intent of the project is to replace the entirety of the storefront , including transoms , doors , hardware , motorized door controllers , pedestrian sensors , ADA door actuators and operators , etc . with a Stanley Dura - Glide 3000 system with bottom rail locking deadbolts , Stanley doors with heavy duty hinges , and Stanley ‘ M - Force ’ automatic low energy swing door operators and actuators . Generally , the bidder is responsible for providing a turn - key demolition and installation of a like kind storefront system including the following : 1 . Contractor to coordinate with Owner for required demolition hours and installation hours . All demolition and installation to occur during normal business hours ; specifically , between 0800 – 1800 hours Monday , Tuesday , Wednesday , and Thursdays . a . At no time shall Contractor completely restrict ingress nor egress . b . Contractor shall maintain at least 50 % of the available doors to be operational during the work of the project . 2 . Finishes shall match existing finishes . 3 . Door style quantities and configurations shall match the existing configuration . |
Location
Country | United States of America (USA) |
State | Mississippi |
Source
Source | Mississippi Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Rail, Hotel, Power Generation (CCGT) |
Article published date | 2026-04-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Rail tenders in United States of America
- RFP - Pro-Tem Hearing Examiner
- RFP - Thurston County Lake Management Districts Submerged Aquatic Vegetation Control
- PreQualification of Bidders for Chaboya Improvements
- TOWN OF MANCHESTER PARATRANSIT SERVICES
- Stormwater Management Improvements Ocean County Fire Training Facility Ocean Township
- Work Related Activity Providers Opioid Affected Individuals
- WORKPLACE HARASSMENT PREVENTION TRAINING
- Industry Review Phase Eastridge to BART Regional Connector
