Marina Seawall - MLBE
The scope, dates and status of this tender. A free account opens every field.
Source: California Purchasing Group
1 . This is a design - build repair contract to match the adjacent curved concrete seawall design just to the East of this repair . Shop drawings of concrete reinforced seawall repair to be submitted within 3 - weeks of NTP for approval by City Representative prior to construction . a . Remove existing concre
- Status
- Closed
- Sector
- Water Supply and Storage, Steel, Cement, Car parking, Seaport, Commercial, Automotive
- Location
- California, United States of America
- Updated
- 3 Nov 2026
- Source
- California Purchasing Group
ConstructChat
Ask ConstructChat about Marina Seawall - MLBE
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | 1 . This is a design - build repair contract to match the adjacent curved concrete seawall design just to the East of this repair . Shop drawings of concrete reinforced seawall repair to be submitted within 3 - weeks of NTP for approval by City Representative prior to construction . a . Remove existing concrete cap , and loose brick to solid course . Cast new concrete cap , dowel into wall below . b . Patch voids from dislodged brick face on eastside where back of wall is intact . c . Backfill behind concrete cap . Cast and place 6000psi , 3 ” thick concrete sidewalk using epoxy coated rebar # 5 over void area spaced 1ft O . C . d . Cut and replace approximately 80ft x 15ft of existing sidewalk . e . Existing concrete may be used as fill below the sidewalk . f . NOTE - If this design is to be utilized , the repair shall include drainage to the Bay . Water shall not accumulate on sidewalk , or flow toward the parking lot . g . A staging area will be available adjacent to project site , but final staging location to be coordinated with project manager prior to construction . h . Sidewalk cracks to be filled with self - consolidating grout and topped with flexible joint sealant to prevent future water penetration . i . All rebar and materials to be marine grade quality or epoxy coated to withstand corrosive saline conditions . j . Contractor is responsible for cleaning site after completion and offhaul of all debris materials . i . Contractor must provide detailed records and receipts of all material disposals . |
Location
Country | United States of America (USA) |
State | California |
Source
Source | California Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Water Supply and Storage, Steel, Cement, Car parking, Seaport, Commercial, Automotive |
Article published date | 2026-03-27 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Water Supply and Storage tenders in United States of America
- RFP - Thurston County Lake Management Districts Submerged Aquatic Vegetation Control
- Coatings for Wet Well and Manholes
- Sole Source for Wedeco UV BulbsBallets
- Security Hardware Services
- Chambers Creek Regional Wastewater Treatment Plant BNR Aeration Basin Airflow Meters
- Se Dixie Highway County Road A1A Utility Relocation Project
- UNPAINTED SNOW FENCE AND DUNE GRASS NO II
- PreQualification of Bidders for Chaboya Improvements
