Marine Simulator Relocation, Equipment and Upgrade's
The scope, dates and status of this tender. A free account opens every field.
Source: Open Contracting Data Standard (OCDS)
The following elements are required to fully relocate and upgrade the existing Marine simulators: Ships Bridge Simulator K-Sim Navigation upgrade: • Project/quality Management • Documentation • Assembly and configuration • Shipment • Installation on Site • Warranty K-Sim Navigation Full Mission and Desktop Simulator System Relocation: • Supervision and dismantling of existing simulators • Supervis
- Status
- Closed
- Sector
- Advanced Electronics, Bridge, Seaport
- Location
- United Kingdom
- Updated
- 3 Nov 2026
- Source
- Open Contracting Data Standard (OCDS)
ConstructChat
Ask ConstructChat about Marine Simulator Relocation, Equipment and Upgrade's
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | complete |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The following elements are required to fully relocate and upgrade the existing Marine simulators: Ships Bridge Simulator K-Sim Navigation upgrade: • Project/quality Management • Documentation • Assembly and configuration • Shipment • Installation on Site • Warranty K-Sim Navigation Full Mission and Desktop Simulator System Relocation: • Supervision and dismantling of existing simulators • Supervision and mantling of simulator in new location • Testing and perform an SAT of the relocated system Installation of AV equipment (wall-mounted monitors, speakers, mics etc) in Instructor/debrief rooms Ships Engine Room Control Room Simulator K-Sim Engine Full Mission #1 and Desktop Simulator System Relocation: • Supervision and dismantling of existing simulators • Supervision and mantling of simulator in new location • Testing and perform an SAT of the relocated system • Replace existing lighting relays in AutoChief • Re-install existing AV equipment (wall-mounted monitors, speakers, mics etc) in Instructor/debrief rooms • Documentation • Project/Quality management K-Sim Engine Full Mission #1 Expansion: • 1x 65" Touch monitor with wall bracket and computer with graphics card • 2x Local operating stations • Documentation • Project/Quality management • Packing and Shipment • Living • Site Acceptance Test • Warranty K-Sim Engine Full Mission #1 Simulator Software License: • 1x Walkthrough License for:− K-Sim Engine MAN B&W 5L90MC VLCC L11-V • 1x Xbox controller • Documentation • Project/Quality management • Living • Software Installation on 65" Touch monitor in item 1.2 • Site Acceptance Test • Training, 1 day • Warranty Network equipment, new switches for Full Mission #1 • 3 x 24-Port switches • Installation Milestone CCTV Cameras: • 1 x Computer with monitor (client station) • 1 x PoE Switch • 3 x Cameras with microphone • 3 x Milestone Device Licenses • Installation K-Sim Engine Desktop Software Licenses for WS Room #1: • 5 x Floating Desktop Licenses for K-Sim Engine DEDF42 Cruise Ferry - II • Remote Installation • Warranty |
Location
Country | United Kingdom (UK) |
Source
Source | Open Contracting Data Standard (OCDS) |
URL |
More Details
Record type | Tender |
Sector | Advanced Electronics, Bridge, Seaport |
Article published date | 2026-05-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
