Materials Testing 2026 - Concrete Testing Requirements ( Air , Slump , Unit Weight , Temperature and 4 Cylinder Tests )
Sector: Cement • Location: Montana, United States of America
Source: Montana Purchasing Group
Concrete Testing Requirements ( Air , Slump , Unit Weight , Temperature and 4 Cylinder Tests ) • Unit bid price shall include all labor , time , equipment , and travel necessary to properly perform tests and provide results as specified . Travel time to and from the site to collect field cured samples shall also b
- Status
- Closed
- Sector
- Cement
- Location
- Montana, United States of America
- Updated
- 3 Nov 2026
- Source
- Montana Purchasing Group
ConstructChat
Ask ConstructChat about Materials Testing 2026 - Concrete Testing Requirements ( Air , Slump , Unit Weight , Temperature and 4 Cylinder Tests )
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Concrete Testing Requirements ( Air , Slump , Unit Weight , Temperature and 4 Cylinder Tests ) • Unit bid price shall include all labor , time , equipment , and travel necessary to properly perform tests and provide results as specified . Travel time to and from the site to collect field cured samples shall also be considered subsidiary to the unit bid price . • Employee will be required to wear proper PPE ( Hardhat and Safety Vest at minimum ) while on the job site . • All costs associated with the employee performance testing on the location , in the lab , and the costs associated with the equipment needed to perform the testing . • One Air Test , one Unit Weight Measurement , one Slump Test , one Temperature Test , and 5 Cylinder Tests will be performed in association with each bid unit . Concrete sampling and testing shall be performed in accordance with applicable ACI and ASTM standards . • After proper curing time , cylinder testing will include cylinder breaks . One 7 day break , three 28 day breaks , and 1 hold cylinder . The hold cylinder may be disposed of once 28 day results have been determined to be satisfactory . If 28 day breaks fall below minimum required compressive strength , the hold cylinder will be used for a later test as directed by the City . • Each bid unit will include a copy of all associated testing data to accompany all invoices billed by the contractor . • All specified tests must be completed to invoice one bid unit . • A Concrete Test bid unit will be considered as one site visit with one set of tests . • An appropriately sized cooler for four cylinders , will be provided by the Contractor to store the test cylinders while they field cure . Final curing will be required at the testing lab in accordance with testing standards after cylinders have been stripped from their molds . |
Location
Country | United States of America (USA) |
State | Montana |
Source
Source | Montana Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Cement |
Article published date | 2026-04-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Cement tenders in United States of America
- RFP - Thurston County Lake Management Districts Submerged Aquatic Vegetation Control
- Horsehaven Creek Culvert Replacement Project D230
- 23B49SR Marine Science Center Turtle Canopy
- Se Dixie Highway County Road A1A Utility Relocation Project
- PreQualification of Bidders for Chaboya Improvements
- 2022 Concrete Repairs Jackson Manor Subdivision
- SAC Building 10318 Exterior Paint
- Fire Station 32 ADA Restroom Improvements
