MFWQTC Chlorine Contact Tanks and FEPS Structural Repairs
The scope, dates and status of this tender. A free account opens every field.
Source: Kentucky Purchasing Group
Project includes structural repairs to the Chlorine Contact Tanks and FEPS , replacing all Chlorine Contact Tanks gate actuators , addition of hypochlorite and bisulfite fill lines , access drive and pavement modifications , installation of a new safety shower and tepid water loop , demolition of abandoned equipment ,
- Status
- Closed
- Sector
- Waste Processing and Treatment, Energy Storage, Mass Transit, Water Supply and Storage, Road
- Location
- Kentucky, United States of America
- Updated
- 3 Nov 2026
- Source
- Kentucky Purchasing Group
ConstructChat
Ask ConstructChat about MFWQTC Chlorine Contact Tanks and FEPS Structural Repairs
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Project includes structural repairs to the Chlorine Contact Tanks and FEPS , replacing all Chlorine Contact Tanks gate actuators , addition of hypochlorite and bisulfite fill lines , access drive and pavement modifications , installation of a new safety shower and tepid water loop , demolition of abandoned equipment , repairs to the influent chamber top , and replacement of Battery A and B sludge well suspended slabs , full HVAC system replacement within the FEPS , removal of abandoned conduits above the wet wells , and replacement of corroded electrical panels . This work will be within the Morris Forman Water Quality Treatment Center , located at 4522 Algonquin Parkway , Louisville , KY 40211 |
Location
Country | United States of America (USA) |
State | Kentucky |
Source
Source | Kentucky Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Waste Processing and Treatment, Energy Storage, Mass Transit, Water Supply and Storage, Road |
Article published date | 2026-05-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Waste Processing and Treatment tenders in United States of America
- Coatings for Wet Well and Manholes
- Sole Source for Wedeco UV BulbsBallets
- Chambers Creek Regional Wastewater Treatment Plant BNR Aeration Basin Airflow Meters
- Annual Construction Contract For Utility Replacement 2022A
- FY23 Sewer Rehabilitation
- Fire Station 32 ADA Restroom Improvements
- Foothills Trail East Puyallup McMillin Trailhead Improvements
- Pipeline Trail Phase 1 Project
