Middle Yellow River Interceptor Phase 2
Sector: Waste Processing and Treatment • Location: Georgia, United States of America
Source: Georgia Purchasing Group
This Project includes the following Work : 1 . Installation of approximately 6 , 000 feet of 24 - inch diameter DIP gravity sewer 2 . Installation of 19 precast concrete manholes 3 . Abandonment of private septic systems and installation of sewer service connections . 4 . Connection to the existing sewer 5 . Polyethyl
- Status
- Closed
- Sector
- Waste Processing and Treatment, Chemical (Industrial), Water Supply and Storage, Manufacturing (Industrial), Cement
- Location
- Georgia, United States of America
- Updated
- 3 Nov 2026
- Source
- Georgia Purchasing Group
ConstructChat
Ask ConstructChat about Middle Yellow River Interceptor Phase 2
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | This Project includes the following Work : 1 . Installation of approximately 6 , 000 feet of 24 - inch diameter DIP gravity sewer 2 . Installation of 19 precast concrete manholes 3 . Abandonment of private septic systems and installation of sewer service connections . 4 . Connection to the existing sewer 5 . Polyethylene wrap 6 . Multiple stream crossings 7 . Installation of sewer service connections 8 . Installation and maintenance of erosion and sediment control measures 9 . Site restoration and clean - up 10 . Preparation of as - built drawings and providing GIS data for new piping and manholes |
Location
Country | United States of America (USA) |
State | Georgia |
Source
Source | Georgia Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Waste Processing and Treatment, Chemical (Industrial), Water Supply and Storage, Manufacturing (Industrial), Cement |
Article published date | 2026-05-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Waste Processing and Treatment tenders in United States of America
- Coatings for Wet Well and Manholes
- Sole Source for Wedeco UV BulbsBallets
- Chambers Creek Regional Wastewater Treatment Plant BNR Aeration Basin Airflow Meters
- Annual Construction Contract For Utility Replacement 2022A
- FY23 Sewer Rehabilitation
- Fire Station 32 ADA Restroom Improvements
- Foothills Trail East Puyallup McMillin Trailhead Improvements
- Pipeline Trail Phase 1 Project
