Midlands network level pavement whole life costing strategies and analysis - XAIS-PTS Limited
Complete · United Kingdom
Source: Open Contracting Data Standard (OCDS)
The project’s scope significantly evolved since inception. It now requires complex multi-layer, multi-iteration analysis aimed at identifying most optimal whole life costing strategy for short (RIS3-RIS4) and long (20-40 years) term pavement renewals. This will allow to strike a healthy balance between OPEX and CAPEX expenditure, with a positive impact on NH’s imperatives.
- Status
- Closed
- Sector
- Road
- Location
- United Kingdom
- Updated
- 3 Nov 2026
- Source
- Open Contracting Data Standard (OCDS)
ConstructChat
Ask ConstructChat about Midlands network level pavement whole life costing strategies and analysis - XAIS-PTS Limited
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | complete |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The project’s scope significantly evolved since inception. It now requires complex multi-layer, multi-iteration analysis aimed at identifying most optimal whole life costing strategy for short (RIS3-RIS4) and long (20-40 years) term pavement renewals. This will allow to strike a healthy balance between OPEX and CAPEX expenditure, with a positive impact on NH’s imperatives. |
Location
Country | United Kingdom (UK) |
Source
Source | Open Contracting Data Standard (OCDS) |
URL |
More Details
Record type | Tender |
Sector | Road |
Article published date | 2026-04-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
