Mill , AC Resurf , Pipe , App Pave , GR
Sector: Road • Location: South Dakota, United States of America
Source: South Dakota Purchasing Group
The Contractor will perform all construction staking . The staking work includes , but is not limited to , establishing or re - establishing the project centerline ; establishing control points and benchmarks as needed ; setting additional benchmarks as needed ; taking original and final cross sections of all Contractor
- Status
- Closed
- Sector
- Road
- Location
- South Dakota, United States of America
- Updated
- 3 Nov 2026
- Source
- South Dakota Purchasing Group
ConstructChat
Ask ConstructChat about Mill , AC Resurf , Pipe , App Pave , GR
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The Contractor will perform all construction staking . The staking work includes , but is not limited to , establishing or re - establishing the project centerline ; establishing control points and benchmarks as needed ; setting additional benchmarks as needed ; taking original and final cross sections of all Contractor secured borrow sources and State designated borrow sources ; taking cross sections of all topsoil stockpiles ; and staking right - of - way , easements , and fence . The Contractor will perform all construction layout and reference staking necessary for the accurate control and completion of all grading , paving , drainage , median crossovers , signing , pavement marking , permanent benchmarks , detours , fence , and all other appurtenances required for the complete construction and acceptance of the work . The layout will include , but is not limited to , staking clearing line , slope staking and slope stake referencing , grade staking ( blue tops ), paving hub staking , and performing the miscellaneous staking as described in the plans and in this specification . Horizontal and vertical control has been established as shown on the plans . Each horizontal and vertical control point will be preserved or reset out of the work limits and available during and after construction is complete . Prior to the Department ’ s final acceptance of the project , the Contractor will replace or reset any control that is disturbed during the construction of the project . The Contractor will provide the Department a list of the in - place control points , including coordinates and elevations relevant to the project control , at the end of the project . The Contractor will perform the staking work in accordance with the Department ’ s Survey Manual , except as modified by this specification . |
Location
Country | United States of America (USA) |
State | South Dakota |
Source
Source | South Dakota Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Road |
Article published date | 2026-04-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
