Mill & Overlay approximately 9 . 8 miles of SR 25 from Renfroe to the Attala County Line
Closed · Mississippi · Last reported Feb 2026
Source: Mississippi Purchasing Group
Mill & Overlay approximately 9 . 8 miles of SR 25 from Renfroe to the Attala County Line , known as Federal Aid Project No . NH - 0056 - 01 ( 106 ) / 108246301 in Leake County . A general description of the work required on the project is as follows : Mill and overlay on approximately 9 . 8 miles of existing
- Status
- Closed
- Sector
- Road
- Location
- Mississippi, United States of America
- Updated
- 3 Nov 2026
- Source
- Mississippi Purchasing Group
ConstructChat
Ask ConstructChat about Mill & Overlay approximately 9 . 8 miles of SR 25 from Renfroe to the Attala County Line
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Mill & Overlay approximately 9 . 8 miles of SR 25 from Renfroe to the Attala County Line , known as Federal Aid Project No . NH - 0056 - 01 ( 106 ) / 108246301 in Leake County . A general description of the work required on the project is as follows : Mill and overlay on approximately 9 . 8 miles of existing asphalt pavement on SR 25 in Leake County beginning at Renfroe , Station 100 + 00 ( BOP ), and ending at the Winston County Line , Station 605 + 38 ( EOP ). Note : The official termini ends at the Attala County Line , but work will extend to the Winston County Line . Details of specific work are mentioned in the following sections . Station 100 + 00 ( BOP ) to Station 605 + 38 ( EOP ) Prior to beginning mill and overlay operations , repair of failed areas in the existing pavement shall be completed in areas HVC soils have caused short , sudden humps and dips in grade profile . Payment of asphalt removal and disposal will be made using Pay Item 202 - B Removal of Asphalt Pavement ( Failed Areas ). These areas are to be removed to full depth or the depth directed by the Engineer and backfilled with 12 . 5mm MT asphalt leveling . After failures have been repaired , milling top 1 ½ ” of existing HMA on mainline shall be completed . After milling has been completed , overlaying with 2 inches of 12 . 5mm MT asphalt shall be completed as per the attached typical sections . Rumble Stripe will be required both North and Southbound as per attached typical sections . Milling Milling / paving will not begin until an approved asphalt mix design has been received , nor until such time that , in the opinion of the Engineer , weather conditions have been consistently suitable enough to allow placement of the asphalt pavement after the milling operations . The Reclaimed Asphalt Pavement ( RAP ) material removed by the milling operation shall become the property of the Contractor . |
Location
Country | United States of America (USA) |
State | Mississippi |
Source
Source | Mississippi Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Road |
Article published date | 2026-04-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Road tenders in United States of America
- RFP - Pro-Tem Hearing Examiner
- NEW TIRES RETREADS AND TIRE SERVICES
- Professional Construction Engineering and Inspection CEI Services for the Williamson Boulevard Widening
- Lincoln Avenue Wascher to Killarney Preliminary Engineering Section 220065800PV
- KilleenFort Hood Regional Airport KFHRA Terminal Apron Rehabilitation Phase II
- IFB 947902022JM Screening 10 Asphalt Filter Stone 8 Granite Double Washed
- IFB 914202022AM Street Sweeper Parts and Brooms
- IFB 843402021AB Hay Alfalfa and Wheat Straw for Norfolk Zoo
