logo

Mill & Overlay approximately 9 . 8 miles of SR 25 from Renfroe to the Attala County Line

Closed · Mississippi · Last reported Feb 2026

Source: Mississippi Purchasing Group

Tender
Closed

Mill & Overlay approximately 9 . 8 miles of SR 25 from Renfroe to the Attala County Line , known as Federal Aid Project No . NH - 0056 - 01 ( 106 ) / 108246301 in Leake County . A general description of the work required on the project is as follows : Mill and overlay on approximately 9 . 8 miles of existing

Status
Closed
Sector
Road
Location
Mississippi, United States of America
Updated
3 Nov 2026
Source
Mississippi Purchasing Group

ConstructChat

Ask ConstructChat about Mill & Overlay approximately 9 . 8 miles of SR 25 from Renfroe to the Attala County Line

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Mill & Overlay approximately 9 . 8 miles of SR 25 from Renfroe to the Attala County Line” is a tender record in Taiyo, linked to the Road sector. It is issued for works, goods, or services related to Mississippi, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

Mill & Overlay approximately 9 . 8 miles of SR 25 from Renfroe to the Attala County Line , known as Federal Aid Project No . NH - 0056 - 01 ( 106 ) / 108246301 in Leake County . A general description of the work required on the project is as follows : Mill and overlay on approximately 9 . 8 miles of existing asphalt pavement on SR 25 in Leake County beginning at Renfroe , Station 100 + 00 ( BOP ), and ending at the Winston County Line , Station 605 + 38 ( EOP ). Note : The official termini ends at the Attala County Line , but work will extend to the Winston County Line . Details of specific work are mentioned in the following sections . Station 100 + 00 ( BOP ) to Station 605 + 38 ( EOP ) Prior to beginning mill and overlay operations , repair of failed areas in the existing pavement shall be completed in areas HVC soils have caused short , sudden humps and dips in grade profile . Payment of asphalt removal and disposal will be made using Pay Item 202 - B Removal of Asphalt Pavement ( Failed Areas ). These areas are to be removed to full depth or the depth directed by the Engineer and backfilled with 12 . 5mm MT asphalt leveling . After failures have been repaired , milling top 1 ½ ” of existing HMA on mainline shall be completed . After milling has been completed , overlaying with 2 inches of 12 . 5mm MT asphalt shall be completed as per the attached typical sections . Rumble Stripe will be required both North and Southbound as per attached typical sections . Milling Milling / paving will not begin until an approved asphalt mix design has been received , nor until such time that , in the opinion of the Engineer , weather conditions have been consistently suitable enough to allow placement of the asphalt pavement after the milling operations . The Reclaimed Asphalt Pavement ( RAP ) material removed by the milling operation shall become the property of the Contractor .

Location

Country

United States of America (USA)

State

Mississippi

Source

Source

Mississippi Purchasing Group

URL

More Details

Record type

Tender

Sector

Road

Article published date

2026-04-29

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender