logo

Milling , Resurfacing & Shoulder Reconstruction - Various Routes - Robeson

Bids closed May 2026 · North Carolina · Last reported Apr 2026

Source: North Carolina Purchasing Group

Tender
Closed

Notify the Engineer 48 hours before milling or resurfacing will interfere with the existing Signal Loops . Loops may need to be placed in milled surface before resurfacing occurs . Coordinate all signal loop operations with the Engineer . For partial or wheel track milling operations on two - way , two - lane f

Status
Closed
Sector
Road
Location
North Carolina, United States of America
Updated
3 Nov 2026
Source
North Carolina Purchasing Group

ConstructChat

Ask ConstructChat about Milling , Resurfacing & Shoulder Reconstruction - Various Routes - Robeson

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Milling , Resurfacing & Shoulder Reconstruction - Various Routes - Robeson” is a tender record in Taiyo, linked to the Road sector. It is issued for works, goods, or services related to North Carolina, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

Notify the Engineer 48 hours before milling or resurfacing will interfere with the existing Signal Loops . Loops may need to be placed in milled surface before resurfacing occurs . Coordinate all signal loop operations with the Engineer . For partial or wheel track milling operations on two - way , two - lane facilities , mill and pave back by the end of each work day . For Partial or wheel track milling operation on multi - lane facilities , the lane being milled may be left closed and paved back within 72 hours . The following options are available during Resurfacing and milling operations on two - way , twolane facilities when the entire roadway or entire lane is to be milled : ( A ) Mill a single lane and pave back by the end of each work day . ( B ) Mill the entire width of roadway and pave back within 72 hours . The following options are available during Resurfacing and milling operations on multi - lane facilities when all lanes or a single lane in one direction are to be milled : ( A ) Mill a single lane and pave back by the end of each work day . ( B ) Mill the entire width of pavement for all lanes to be milled in any direction daily and pave back within 72 hours . Slope the pavement at the beginning and end of the daily milling operation as directed by the Engineer . Sweep and remove all milled material from the roadway as soon as the daily milling operation is completed . Continue milling operations until the section of roadway being milled is complete . Remove any existing pavement adjacent to the milled area that has been damaged and replace it with patch material as directed by the Engineer ...

Location

Country

United States of America (USA)

State

North Carolina

Source

Source

North Carolina Purchasing Group

URL

More Details

Record type

Tender

Sector

Road

Article published date

2026-05-08

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender