Milling , Resurfacing & Shoulder Reconstruction - Various Routes - Robeson
Bids closed May 2026 · North Carolina · Last reported Apr 2026
Source: North Carolina Purchasing Group
Notify the Engineer 48 hours before milling or resurfacing will interfere with the existing Signal Loops . Loops may need to be placed in milled surface before resurfacing occurs . Coordinate all signal loop operations with the Engineer . For partial or wheel track milling operations on two - way , two - lane f
- Status
- Closed
- Sector
- Road
- Location
- North Carolina, United States of America
- Updated
- 3 Nov 2026
- Source
- North Carolina Purchasing Group
ConstructChat
Ask ConstructChat about Milling , Resurfacing & Shoulder Reconstruction - Various Routes - Robeson
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Notify the Engineer 48 hours before milling or resurfacing will interfere with the existing Signal Loops . Loops may need to be placed in milled surface before resurfacing occurs . Coordinate all signal loop operations with the Engineer . For partial or wheel track milling operations on two - way , two - lane facilities , mill and pave back by the end of each work day . For Partial or wheel track milling operation on multi - lane facilities , the lane being milled may be left closed and paved back within 72 hours . The following options are available during Resurfacing and milling operations on two - way , twolane facilities when the entire roadway or entire lane is to be milled : ( A ) Mill a single lane and pave back by the end of each work day . ( B ) Mill the entire width of roadway and pave back within 72 hours . The following options are available during Resurfacing and milling operations on multi - lane facilities when all lanes or a single lane in one direction are to be milled : ( A ) Mill a single lane and pave back by the end of each work day . ( B ) Mill the entire width of pavement for all lanes to be milled in any direction daily and pave back within 72 hours . Slope the pavement at the beginning and end of the daily milling operation as directed by the Engineer . Sweep and remove all milled material from the roadway as soon as the daily milling operation is completed . Continue milling operations until the section of roadway being milled is complete . Remove any existing pavement adjacent to the milled area that has been damaged and replace it with patch material as directed by the Engineer ... |
Location
Country | United States of America (USA) |
State | North Carolina |
Source
Source | North Carolina Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Road |
Article published date | 2026-05-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Road tenders in United States of America
- RFP - Pro-Tem Hearing Examiner
- NEW TIRES RETREADS AND TIRE SERVICES
- Professional Construction Engineering and Inspection CEI Services for the Williamson Boulevard Widening
- Lincoln Avenue Wascher to Killarney Preliminary Engineering Section 220065800PV
- KilleenFort Hood Regional Airport KFHRA Terminal Apron Rehabilitation Phase II
- IFB 947902022JM Screening 10 Asphalt Filter Stone 8 Granite Double Washed
- IFB 914202022AM Street Sweeper Parts and Brooms
- IFB 843402021AB Hay Alfalfa and Wheat Straw for Norfolk Zoo
