MISCELLANEOUS CONCRETE
One of 9,439 tenders Taiyo tracks in Wisconsin.
Source: Wisconsin Purchasing Group
REPAIR AND REPLACEMENT OF PUBLIC SIDEWALK , CURB AND GUTTER IN AREA 4 AND VARIOUS OTHER AREAS THROUGH OUT MIDDLETON AND INSTALLATION OF BUS PADS 2026 Date Stamp must be supplied by Contractor Sidewalk can only be replaced ONE SIDE at a time to maintain pedestrian flow . Sidewalk closure signage must b
- Status
- Closed
- Sector
- Car parking, Cement, Automotive
- Location
- Wisconsin, United States of America
- Updated
- 3 Nov 2026
- Source
- Wisconsin Purchasing Group
ConstructChat
Ask ConstructChat about MISCELLANEOUS CONCRETE
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | REPAIR AND REPLACEMENT OF PUBLIC SIDEWALK , CURB AND GUTTER IN AREA 4 AND VARIOUS OTHER AREAS THROUGH OUT MIDDLETON AND INSTALLATION OF BUS PADS 2026 Date Stamp must be supplied by Contractor Sidewalk can only be replaced ONE SIDE at a time to maintain pedestrian flow . Sidewalk closure signage must be placed at crossings prior to closings |
Location
Country | United States of America (USA) |
State | Wisconsin |
Source
Source | Wisconsin Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Car parking, Cement, Automotive |
Article published date | 2026-05-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Car parking tenders in United States of America
- Security Hardware Services
- Lincoln Avenue Wascher to Killarney Preliminary Engineering Section 220065800PV
- PreQualification of Bidders for Chaboya Improvements
- 2022 Concrete Repairs Jackson Manor Subdivision
- Pierce County Parks General Site Construction Services
- Foothills Trail East Puyallup McMillin Trailhead Improvements
- Citywide Tree and Stump Removal 2022
- Commercial Appliance Diagnostic and Repair Services
