Missoula Utility Rate Study and Financial Plan
Closed · Montana · Last reported Mar 2026
Source: Montana Purchasing Group
The general scope of work may include , but will not necessarily be limited to , the following : 1 . Evaluate & recommend rates for residential and commercial domestic water distribution including : irrigation and fire suppression services , tap installation , meter installation cost and hydrant use billing . Complete lo
- Status
- Closed
- Sector
- Water Supply and Storage, Power Transmission, Power Generation (CCGT), Manufacturing (Industrial), Commercial, Residential
- Location
- Montana, United States of America
- Updated
- 3 Nov 2026
- Source
- Montana Purchasing Group
ConstructChat
Ask ConstructChat about Missoula Utility Rate Study and Financial Plan
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The general scope of work may include , but will not necessarily be limited to , the following : 1 . Evaluate & recommend rates for residential and commercial domestic water distribution including : irrigation and fire suppression services , tap installation , meter installation cost and hydrant use billing . Complete long term financial projections to support recommended rates . 2 . Evaluate & recommend rates for residential , commercial and industrial wastewater collection and treatment services . Consideration should be given for re - evaluating commercial flat rate minimum charges . Complete long term financial projections to support recommended rates . 3 . Evaluate & recommend rates for residential and commercial stormwater utility services . The City currently bills stormwater on a trip - based structure . The City can adjust the Annual Regulatory Compliance Charge , Annual Operations and Maintenance Charge , and Annual Trip Charge . The Average Daily Trips are not adjustable as it is determined by the Institute of Transportation Engineers Trip Generation Manual . Evaluate & recommend a rate component to support longterm maintenance of green stormwater infrastructure , including medians , swales , and urban forest . Complete long term financial projections to support recommended rates . 4 . Evaluate and recommend rates for Water and Wastewater Development fees that can be used to fund growth - related capital improvements per City Ordinance 3662 . See Addendum 2 . 5 . The Consultant should provide options for low - income utility assistance programs as may be allowed by Montana law . 6 . Provide the City with the rate model for the Water , Wastewater , and Stormwater Utilities in an unlocked Excel - native format . 7 . Produce a written report summarizing the findings and recommendations for the proposed rate structures and schedules . Separate rates should be presented for each utility as well as separate Water and Wastewater Development fees 8 . Develop and present a Power Point presentation to City Council 9 . Prepare all work products and reports in conformance with applicable regulations , Montana state law , policies , and guidelines as necessary to facilitate applications for state and federal funding programs . 10 . All financial projections shall be based on at least a ten - year period including assumptions for growth , O & M / capital needs , inflation , and reserve targets . |
Location
Country | United States of America (USA) |
State | Montana |
Source
Source | Montana Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Water Supply and Storage, Power Transmission, Power Generation (CCGT), Manufacturing (Industrial), Commercial, Residential |
Article published date | 2026-04-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Water Supply and Storage tenders in United States of America
- RFP - Thurston County Lake Management Districts Submerged Aquatic Vegetation Control
- Coatings for Wet Well and Manholes
- Sole Source for Wedeco UV BulbsBallets
- Security Hardware Services
- Chambers Creek Regional Wastewater Treatment Plant BNR Aeration Basin Airflow Meters
- Se Dixie Highway County Road A1A Utility Relocation Project
- UNPAINTED SNOW FENCE AND DUNE GRASS NO II
- PreQualification of Bidders for Chaboya Improvements
