MITCHELL BROOK ROAD CULVERT No . 9 REPLACEMENT PROJECT
Sector: Water Supply and Storage • Location: Vermont, United States of America
Source: Vermont Purchasing Group
Culvert 9 will be replaced with two new culverts as follows : 1 . A new culvert will be required to handle the ditch conveyance and is to be a 30 - inch corrugated metal pipe ( CMP ). This pipe is to be an aluminized metal pipe with a minimum 12 - gauge thickness . The culvert will be approximately 3
- Status
- Closed
- Sector
- Water Supply and Storage, Metal, Road
- Location
- Vermont, United States of America
- Updated
- 3 Nov 2026
- Source
- Vermont Purchasing Group
ConstructChat
Ask ConstructChat about MITCHELL BROOK ROAD CULVERT No . 9 REPLACEMENT PROJECT
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Culvert 9 will be replaced with two new culverts as follows : 1 . A new culvert will be required to handle the ditch conveyance and is to be a 30 - inch corrugated metal pipe ( CMP ). This pipe is to be an aluminized metal pipe with a minimum 12 - gauge thickness . The culvert will be approximately 35 feet in length . 2 . A new culvert will be required to handle the intermittent stream that comes off the hillside from the northwest and will require a separate CMP with a minimum 87 - inch x 63 - inch pipe arch providing 32 square feet of waterway area or similar . This pipe is to be an aluminized metal pipe with a minimum 10 - gauge thickness . The culvert will be approximately 35 feet in length . The existing metal Culvert No . 9 will be excavated , removed , and disposed of by the contractor . It is to be noted that there is bedrock ( ledge material ) in the area and was observed to be directly under the existing culvert . Removal of this bedrock material will likely be required for the new culvert installations . Existing backfill will be removed from the trench excavation site by the contractor . Trench bottoms containing bedrock , soft muck , refuse , or other material unable to provide long - term uniform pipe support are unacceptable . |
Location
Country | United States of America (USA) |
State | Vermont |
Source
Source | Vermont Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Water Supply and Storage, Metal, Road |
Article published date | 2026-04-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Water Supply and Storage tenders in United States of America
- RFP - Thurston County Lake Management Districts Submerged Aquatic Vegetation Control
- Coatings for Wet Well and Manholes
- Sole Source for Wedeco UV BulbsBallets
- Security Hardware Services
- Chambers Creek Regional Wastewater Treatment Plant BNR Aeration Basin Airflow Meters
- Se Dixie Highway County Road A1A Utility Relocation Project
- UNPAINTED SNOW FENCE AND DUNE GRASS NO II
- PreQualification of Bidders for Chaboya Improvements
