logo

MnDOT Adrian Eastbound Rest Area Septic Tank Rehab

Bids closed Mar 2026 · Minnesota · Last reported Mar 2026

Source: Minnesota Purchasing Group

Tender
Closed

A . The work will be done under one prime contract that includes : General . B . The following summary is a general guide to the scope of work . It should not be construed as a detailed list of work included in the contract . 1 . Adrian Rest Area a . Pump septic tank and dispose of contents at a w

Status
Closed
Sector
Waste Processing and Treatment, Power Generation (CCGT), Water Supply and Storage
Location
Minnesota, United States of America
Updated
3 Nov 2026
Source
Minnesota Purchasing Group

ConstructChat

Ask ConstructChat about MnDOT Adrian Eastbound Rest Area Septic Tank Rehab

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “MnDOT Adrian Eastbound Rest Area Septic Tank Rehab” is a tender record in Taiyo, linked to the Waste Processing and Treatment sector. It is issued for works, goods, or services related to Minnesota, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

A . The work will be done under one prime contract that includes : General . B . The following summary is a general guide to the scope of work . It should not be construed as a detailed list of work included in the contract . 1 . Adrian Rest Area a . Pump septic tank and dispose of contents at a wastewater treatment facility b . Power wash interior of septic tank to remove all lose / corroded material c . Coat interior of septic tank with a cementitious coating d . Provide all confined space entry / atmospheric monitoring required to do work 2 . Worthington TIC a . Pump Septic Tank and dispose of contents at a wastewater treatment facility b . Provide drainfield lateral access manholes and associated piping / valves at each of the four drainfield beds c . Final restoration of all disturbed areas d . Sanitary sewage flow control so the facility remains open to the public and operational

Location

Country

United States of America (USA)

State

Minnesota

Source

Source

Minnesota Purchasing Group

URL

More Details

Record type

Tender

Sector

Waste Processing and Treatment, Power Generation (CCGT), Water Supply and Storage

Article published date

2026-05-02

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender