Modify Intersection , and Lighting
Closed · South Dakota · Last reported Apr 2026
Source: South Dakota Purchasing Group
The Contractor will revise the design surface DTM as required to support construction operations and to reflect any contract plan revisions the Department makes . The Contractor will perform checks to confirm the revised design surface DTM agrees with the contract plan revisions . The Contractor will provide
- Status
- Closed
- Sector
- Telecommunications
- Location
- South Dakota, United States of America
- Updated
- 3 Nov 2026
- Source
- South Dakota Purchasing Group
ConstructChat
Ask ConstructChat about Modify Intersection , and Lighting
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The Contractor will revise the design surface DTM as required to support construction operations and to reflect any contract plan revisions the Department makes . The Contractor will perform checks to confirm the revised design surface DTM agrees with the contract plan revisions . The Contractor will provide a copy of the resultant revised design surface DTM to the Engineer in LandXML . The Department will pay for costs incurred to incorporate contract plan revisions as extra work . The Contractor will designate a set of control points , including a total of at least 6 horizontal and vertical points or 2 per mile , whichever is greater , for site calibration for the portion of the project employing MCG . The Contractor will incorporate the Department provided control framework used for the original survey and design . The Contractor will calibrate the site by determining the parameters governing the transformation of satellite information into the project coordinate system . The Contractor will use the control points provided by the Department for the initial site calibration . The Contractor will provide the resulting site calibration file to the Engineer before beginning subgrade construction . In addition to the site calibration , the Contractor will perform site calibration checks at individual control points not used in the initial site calibration . At a minimum , the Contractor will check the calibration at the start of each day as described in the contractor ' s MCG work plan . The Contractor will report out - of - tolerance checks to the Engineer . The measured position must match the established position at each individual control point within the horizontal tolerance of ± 0 . 1 foot and the vertical tolerance of ± 0 . 05 foot . |
Location
Country | United States of America (USA) |
State | South Dakota |
Source
Source | South Dakota Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Telecommunications |
Article published date | 2026-05-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Telecommunications tenders in United States of America
- Demolition 601 N Stella Ave
- Electric Trailer Mounted Underground Cable Puller
- 40 Gigabits per Second Collocation Switch Between VTA and Internet Service Provider Internet Point of Presence
- Airport Terminal HVAC Improvements Phase II Vestibule Upgrades ReBid
- Widening of US 101 SB to SR 87 SB Connector Ramp US 101 SB Onramp from Story Rd
- Telephone System Consulting Services
- External Audit RFP
- Tuolumne County Broadband Environmental Assessment
