logo

Modular Furniture Installation and Refurbishment Services

Sector: Water Supply and Storage • Location: California, United States of America

Source: California Purchasing Group

Tender
Closed

a . Master Installer , Lead Installer , and Installer The Master Installer must possess technical knowledge of modular systems , manufacturer specifications , and industry best practices , and must have experience leading installation teams on projects . Master Installer i . Provide ( if applicable ) and interpret drawings , pl

Status
Closed
Sector
Water Supply and Storage, Warehouse, Commercial, Residential
Location
California, United States of America
Updated
3 Nov 2026
Source
California Purchasing Group

ConstructChat

Ask ConstructChat about Modular Furniture Installation and Refurbishment Services

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Modular Furniture Installation and Refurbishment Services” is a tender record in Taiyo, linked to the Water Supply and Storage sector. It is issued for works, goods, or services related to California, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

a . Master Installer , Lead Installer , and Installer The Master Installer must possess technical knowledge of modular systems , manufacturer specifications , and industry best practices , and must have experience leading installation teams on projects . Master Installer i . Provide ( if applicable ) and interpret drawings , plans , and specifications ii . Coordinate site conditions , measurements , and layout iii . Lead and supervise installation crews iv . Monitor compliance with all guidelines and safety regulations v . Perform or oversees complex installations vi . Conduct quality control and resolve installation issues vii . Acts as primary on - site point of contact viii . Monitor timely completion per Work Order schedule The Lead Installer must possess working knowledge of modular systems , installation methods , and manufacturer specifications , and must lead a crew of Installers on assigned tasks . Lead Installer i . Interpret drawings and layouts for accurate execution ii . Assign tasks to installation crew and monitor productivity iii . Perform installation work , as needed iv . Report issues , discrepancies , and material shortages v . Monitor compliance with guidelines , safety , and site rules vi . Assist with layout verification and punch list completion vii . Maintains a clean , safe , and organized work environment viii . Monitor timely completion per Work Order schedule The Installer must possess practical knowledge of installation methods , tools , and materials required for modular furniture , as well as the skill to install additional office equipment such as TV mounts , whiteboards , network racking , and other office equipment when necessary . Installer i . Assemble , install , and reconfigure modular furniture ii . Follow drawings , layouts , and instructions for proper placement iii . Perform measuring , leveling , anchoring , and adjustments iv . Handle and transport materials safely and efficiently v . Report damages or conflicts to Lead Installer vi . Assist with site prep and cleanup vii . Follow all safety requirements viii . Assist with punch list ( if applicable ) and project closeout b . Modular Components i . The Contractor must be competent in the handling and installing of Allsteel , Haworth , and California Correctional Training and Rehabilitation Authority ( Formerly Prison Industry Authority ) modular components . At this time , the Department currently has these types of modular components . ii . Ability and equipment to cut panels and work surfaces , to recover panels if necessary , and to paint / touch up components as specified by scope of work . c . Cleanup of Work Area i . The work area will be cleaned up at the end of each day and also cleaned up when the work is completed , to prevent safety hazards and unsightly conditions within the building . ii . Disposal of rubbish will be the responsibility of the Contractor and cannot be discarded in the building trash container or at the Department ’ s Warehouse dumpster . d . Warehouse i . The Contractor will assist in maintaining and organizing modular and non - modular furniture at the Warehouse as directed by the DWR Contract Coordinator or Contract Manager , including cleaning , disassembling , and returning reusable items to inventory . ii . The Contractor will monitor modular inventory levels , conduct spots checks and cycle counts as requested , and notify the DWR Contract Coordinator or Contract Manager of insufficient stock , and of any inventory removed from and returned to the Warehouse .

Location

Country

United States of America (USA)

State

California

Source

Source

California Purchasing Group

URL

More Details

Record type

Tender

Sector

Water Supply and Storage, Warehouse, Commercial, Residential

Article published date

2026-05-10

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender