Monroe Harbor Advanced Maintenance Dredging
Sector: Aerospace & Defense • Location: MITN, United States of America
Source: MITN Purchasing Group
*** Posting of Bid Abstract *** Monroe Harbor Advanced Maintenance Dredging - The project requirements include : Mobilize dredge to Monroe Harbor . Monroe Harbor will be mechanically dredged due to the character of materials ( boulders , rocks , and more clay - like material ) within the harbor . Dredged material placement
- Status
- Closed
- Sector
- Aerospace & Defense, Water Supply and Storage, Seaport
- Location
- MITN, United States of America
- Updated
- 3 Nov 2026
- Source
- MITN Purchasing Group
ConstructChat
Ask ConstructChat about Monroe Harbor Advanced Maintenance Dredging
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | *** Posting of Bid Abstract *** Monroe Harbor Advanced Maintenance Dredging - The project requirements include : Mobilize dredge to Monroe Harbor . Monroe Harbor will be mechanically dredged due to the character of materials ( boulders , rocks , and more clay - like material ) within the harbor . Dredged material placement method is unrestricted . The harbor will be dredged to a depth of 23 - ft below Low Water Datum ( LWD ) plus 1 - ft overdepth or point of refusal , whichever is less , within the main channel for STA 60 + 00 to 76 + 00 , 0 + 00 to 20 + 00 river and 0 + 00 to 20 + 00 lake . From STA 15 + 75 to 4 + 00 , a section near the wall will be dredged to 20 ft below LWD plus 1 - ft overdepth or point of refusal , whichever is less . The turning basin will be dredged to a depth of 20 - ft below LWD plus 1 - ft overdepth or point of refusal , whichever is less , for STA 64 + 72 to 79 + 00 . Placement of dredged material will be in Cell 3 at Pointe Mouillee Confined Disposal Facility ( CDF ). No discharge is allowed at Pointe Mouillee CDF . Demobilize when dredge work is complete . |
Location
Country | United States of America (USA) |
State | MITN |
Source
Source | MITN Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Aerospace & Defense, Water Supply and Storage, Seaport |
Article published date | 2026-05-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Aerospace & Defense tenders in United States of America
- Indigent Defense Services for Misdemeanor Cases Public Defender
- Notice of Intent to Award a NonCompetitive Procurement for Siemens Logistics High Speed Diverters
- This is a Notification Only Continuing OnCall Architecture and Engineering Consulting Services W00486
- Electronic Gate Replacement
- INFORMATION TECHNOLOGY IT CONTINUING CONSULTING SERVICES
- Airport Terminal HVAC Improvements Phase II Vestibule Upgrades ReBid
- NonExclusive Airport Rental Car Concession
- Procurement Consulting Services
