Monroe Harbor Advanced Maintenance Dredging
Sector: Water Supply and Storage • Location: United States of America
Source: SAM.gov
Monroe Harbor Advanced Maintenance Dredging - The project requirements include: Mobilize dredge to Monroe Harbor. Monroe Harbor will be mechanically dredged due to the character of materials (boulders, rocks, and more clay-like material) within the harbor. Dredged material placement method is unrestricted. The harbor will be dredged to a depth of 23-ft below Low Water
- Status
- Closed
- Sector
- Water Supply and Storage, Seaport, Aerospace & Defense, Residential, Commercial
- Location
- United States of America
- Updated
- 3 Nov 2026
- Source
- SAM.gov
ConstructChat
Ask ConstructChat about Monroe Harbor Advanced Maintenance Dredging
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | solicitation |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | ***Posting of Bid Abstract***Monroe Harbor Advanced Maintenance Dredging - The project requirements include: Mobilize dredge to Monroe Harbor. Monroe Harbor will be mechanically dredged due to the character of materials (boulders, rocks, and more clay-like material) within the harbor. Dredged material placement method is unrestricted. The harbor will be dredged to a depth of 23-ft below Low Water Datum (LWD) plus 1-ft overdepth or point of refusal, whichever is less, within the main channel for STA 60+00 to 76+00, 0+00 to 20+00 river and 0+00 to 20+00 lake. From STA 15+75 to 4+00, a section near the wall will be dredged to 20 ft below LWD plus 1-ft overdepth or point of refusal, whichever is less. The turning basin will be dredged to a depth of 20-ft below LWD plus 1-ft overdepth or point of refusal, whichever is less, for STA 64+72 to 79+00. Placement of dredged material will be in Cell 3 at Pointe Mouillee Confined Disposal Facility (CDF). No discharge is allowed at Pointe Mouillee CDF. Demobilize when dredge work is complete. |
Original sector | Construction |
Location
Country | United States of America (USA) |
Source
Source | SAM.gov |
URL |
More Details
Record type | Tender |
Sector | Water Supply and Storage, Seaport, Aerospace & Defense, Residential, Commercial |
Article published date | 2026-01-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
