logo

Morgan County Public Safety Complex Roof Replacement

Sector: Manufacturing (Industrial) • Location: Georgia, United States of America

Source: Georgia Purchasing Group

Tender
Closed

Base scope of work : • Remove and replace existing TPO roof over Public Safety Office ( Sheriff , Fire Headquarters , Emergency management and Maintenance ) o ½ ” High density recovery board to be mechanically fastened over existing or replaced ISO . o 60 mil TPO membrane to be used o Manufacturer 20 year warr

Status
Closed
Sector
Manufacturing (Industrial), Metal, Commercial, Residential
Location
Georgia, United States of America
Updated
3 Nov 2026
Source
Georgia Purchasing Group

ConstructChat

Ask ConstructChat about Morgan County Public Safety Complex Roof Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Morgan County Public Safety Complex Roof Replacement” is a tender record in Taiyo, linked to the Manufacturing (Industrial) sector. It is issued for works, goods, or services related to Georgia, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

Base scope of work : • Remove and replace existing TPO roof over Public Safety Office ( Sheriff , Fire Headquarters , Emergency management and Maintenance ) o ½ ” High density recovery board to be mechanically fastened over existing or replaced ISO . o 60 mil TPO membrane to be used o Manufacturer 20 year warrantee o Installer 5 year leak free warranty o Establish walkways / around mechanical units and regular service areas • Remove , preserve , and reinstall lightning protection o 3rd party UL “ letter of findings ” • Replace all impacted sheet metal trim , gutter , flashing , with color matched factory finish . • Enhance roof drainage o Establish sump at all drains o Enhance crickets to minimum slope , if applicable • Inspect insulation board and replace damaged boards , to be paid per board foot . • Add walkpad on the service side ( s ) of all mechanical units and two rows at the access door . Existing walk pad does not need to be replaced in the current location . • Contract to obtain all required permits • Incidental : All other work required to achieve this scope of work is included • Maintain access to the PSC at all times . General conditions : • Coordinate with engineer , as required , including , but not limited to : o Semi - weekly inspections o Schedule – Weekly updates o Shop drawings o Key deliveries o Any work impacting tenant or County use o Any damages , injuries , accidents , or complaints are to be reported immediately o All specialized work and installation o All contact : Aaron Wadley – Terra Via Engineering  404 - 326 - 4522  aaron @ tv - eng . com • All environmental and safety regulations are to be strictly followed . • Authorized work areas and staging areas are to be agreed ahead of time and will be fully restored upon completion • All equipment and materials necessary to do the full scope of work are to be included • Contractor may be given access to certain areas in the building interior . This access must be controlled by a responsible party . Building interior is not to be used for storage of materials , general roof access , restrooms , etc . Interior access may require signin / sign - out controls . Certain individuals or all personnel may be barred from accessing the interior of the building for a period of time or throughout the project . • Certain areas over inmate or other occupied space require scheduling in advance to relocate inmates and / or operations activities . Unscheduled work will be subject to LDs at the discretion of the engineer . • Protect the grounds and surrounding areas from damage during work . Restore any damaged areas to their original condition . • Portable toilet to be kept on - site . 1 per 10 people , cleaned weekly at a minimum . • Contractor is not to bill more than the purchase order amount without written authorization . • All work described below is included in the lump sum bid unless specifically mentioned otherwise . • Any work required to complete this scope but not specifically called out is considered incidental and is to be completed in the overall scope under the lump sum bid . • Remove and dispose of all debris associated with this work . • A minimum of 10 % will be withheld until Final inspection and all warranties are received . • Includes bid bond issued by a surety licensed to do business in Georgia and acceptable to the owner . No cashier ' s checks or similar . Bid bond amount to not be less that 5 % of the bid amount . • 5 % Bid Bond will be required to be submitted with the bid . • 100 % Payment and Performance Bond Will be required upon award . Lightning Protection : • Remove and store the existing lightning protection items in this area , as required . At the completion of roof work reinstall the lightning protection in this area . Add any missing components , replace any broken components to make this roof area complete . Upon completion have a third - party Underwriter ' s Laboratory inspection and obtain a " Letter of Findings " for this rooftop portion of the system addressed to the owner . ( See Special Provisions )

Location

Country

United States of America (USA)

State

Georgia

Source

Source

Georgia Purchasing Group

URL

More Details

Record type

Tender

Sector

Manufacturing (Industrial), Metal, Commercial, Residential

Article published date

2026-04-29

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender