logo

Morrill Hall - Parapet and Roof ( Repair and Replacement )

Bids closed Mar 2026 · Minnesota · Last reported Mar 2026

Source: Minnesota Purchasing Group

Tender
Closed

The Board of Regents of the University of Minnesota ( the “ University ”) is requesting Proposals to provide construction services for parapet and roof repair at Morrill Hall , located on the east bank of the Twin Cities campus ( the “ Project ”). Project Description ( the “ Work ”) The University is requesting Gener

Status
Closed
Sector
Education, Commercial, Residential, Road
Location
Minnesota, United States of America
Updated
3 Nov 2026
Source
Minnesota Purchasing Group

ConstructChat

Ask ConstructChat about Morrill Hall - Parapet and Roof ( Repair and Replacement )

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Morrill Hall - Parapet and Roof ( Repair and Replacement )” is a tender record in Taiyo, linked to the Education sector. It is issued for works, goods, or services related to Minnesota, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

The Board of Regents of the University of Minnesota ( the “ University ”) is requesting Proposals to provide construction services for parapet and roof repair at Morrill Hall , located on the east bank of the Twin Cities campus ( the “ Project ”). Project Description ( the “ Work ”) The University is requesting General Contractor services to provide repair and replacement of various areas of roofing , stone , brick , paint , drainage , sealants and other exterior enclosure components at Morrill Hall . The building address is 100 Church Street SE , Minneapolis , MN 55455 and is included as a contributing part of SHPO ' s historic Northrop Mall . The building functions in a critical role for the University Administration and is a central hub of campus . The selected Respondent will need to work closely with FM , CPM , PTS , PSRE and Landcare to ensure a thoughtful staging and construction plan . Staging and construction plans should be included with Respondent ’ s Proposal . Minimizing disruption to building occupants and providing an efficient construction plan that completes the work over Summer break 2026 , is critical . Contractor should note that there is ACM present on the Project and the selected Respondent will be required to work closely with University HMP to schedule abatement work . Refer to the Haz - mat report included within specifications . Miller Dunwiddie Associates is the Architect / Engineer of Record for the Project . University - Provided Information The University has assembled the following information about the Project ( collectively , the “ RFP Documents ”) for review by the Respondent : This RFP and all Attachments RFx Instructions , Requirements , and Rights Reserved by the University Current Prevailing Wage Rates 100 % Construction Documents ( Drawings and Project Manual dated 02 - 13 - 2026 )

Location

Country

United States of America (USA)

State

Minnesota

Source

Source

Minnesota Purchasing Group

URL

More Details

Record type

Tender

Sector

Education, Commercial, Residential, Road

Article published date

2026-05-02

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender