Mount Carmel Building Asbestos Abatement
The scope, dates and status of this tender. A free account opens every field.
Source: Missouri Purchasing Group
The contractor shall establish a regulated area and full containment appropriate for the material being abated . Requirements include : • Critical barrier sealing of all openings , penetrations , doors , and windows using two layers of 6 - mil poly • Installation of negative air machines ( HEPA - filtered ) sized for the
- Status
- Closed
- Sector
- Water Supply and Storage, Commercial
- Location
- Missouri, United States of America
- Updated
- 3 Nov 2026
- Source
- Missouri Purchasing Group
ConstructChat
Ask ConstructChat about Mount Carmel Building Asbestos Abatement
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The contractor shall establish a regulated area and full containment appropriate for the material being abated . Requirements include : • Critical barrier sealing of all openings , penetrations , doors , and windows using two layers of 6 - mil poly • Installation of negative air machines ( HEPA - filtered ) sized for the space to maintain at least 0 . 02 inches of water column negative pressure and four air changes per hour minimum • Continuous operation of negative air machines until final clearance is achieved • If glove bag work is used : pre - cleaning , intact removal , immediate HEPA vacuuming , and controlled collapse of the bag prior to disposal . • Construction of a decontamination unit attached to containment . • Signage at all entrances identifying the space as an asbestos regulated area . • Protection of non - ACM surfaces within the work area with poly sheeting as needed . 4 . 2 Waste Handling , Packaging , and Disposal The contractor shall manage all asbestos - containing waste in accordance with EPA , OSHA , and Missouri DNR requirements . This includes : • Double - bagging or wrapping in 6 - mil poly with proper asbestos hazard labeling • Use of leak - tight containers for sharp or rigid ACM • Wetting of material to prevent fiber release prior to packaging • Maintaining segregation of asbestos waste from non - hazardous waste • Storage of waste in a secure , covered , designated staging area until transport • Transportation by a licensed asbestos waste hauler • Disposal at an approved landfill authorized to accept asbestos waste • Completion and submission of waste manifests to the Owner upon receipt from the landfill , but no later than 15 calendar days after disposal . • No waste may leave the site without proper labeling , manifests , and documentation ... |
Location
Country | United States of America (USA) |
State | Missouri |
Source
Source | Missouri Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Water Supply and Storage, Commercial |
Article published date | 2026-04-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Water Supply and Storage tenders in United States of America
- RFP - Thurston County Lake Management Districts Submerged Aquatic Vegetation Control
- Coatings for Wet Well and Manholes
- Sole Source for Wedeco UV BulbsBallets
- Security Hardware Services
- Chambers Creek Regional Wastewater Treatment Plant BNR Aeration Basin Airflow Meters
- Se Dixie Highway County Road A1A Utility Relocation Project
- UNPAINTED SNOW FENCE AND DUNE GRASS NO II
- PreQualification of Bidders for Chaboya Improvements
