logo

Mount Carmel Building Asbestos Abatement

The scope, dates and status of this tender. A free account opens every field.

Source: Missouri Purchasing Group

Tender
Closed

The contractor shall establish a regulated area and full containment appropriate for the material being abated . Requirements include : • Critical barrier sealing of all openings , penetrations , doors , and windows using two layers of 6 - mil poly • Installation of negative air machines ( HEPA - filtered ) sized for the

Status
Closed
Sector
Water Supply and Storage, Commercial
Location
Missouri, United States of America
Updated
3 Nov 2026
Source
Missouri Purchasing Group

ConstructChat

Ask ConstructChat about Mount Carmel Building Asbestos Abatement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Mount Carmel Building Asbestos Abatement” is a tender record in Taiyo, linked to the Water Supply and Storage sector. It is issued for works, goods, or services related to Missouri, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

The contractor shall establish a regulated area and full containment appropriate for the material being abated . Requirements include : • Critical barrier sealing of all openings , penetrations , doors , and windows using two layers of 6 - mil poly • Installation of negative air machines ( HEPA - filtered ) sized for the space to maintain at least 0 . 02 inches of water column negative pressure and four air changes per hour minimum • Continuous operation of negative air machines until final clearance is achieved • If glove bag work is used : pre - cleaning , intact removal , immediate HEPA vacuuming , and controlled collapse of the bag prior to disposal . • Construction of a decontamination unit attached to containment . • Signage at all entrances identifying the space as an asbestos regulated area . • Protection of non - ACM surfaces within the work area with poly sheeting as needed . 4 . 2 Waste Handling , Packaging , and Disposal The contractor shall manage all asbestos - containing waste in accordance with EPA , OSHA , and Missouri DNR requirements . This includes : • Double - bagging or wrapping in 6 - mil poly with proper asbestos hazard labeling • Use of leak - tight containers for sharp or rigid ACM • Wetting of material to prevent fiber release prior to packaging • Maintaining segregation of asbestos waste from non - hazardous waste • Storage of waste in a secure , covered , designated staging area until transport • Transportation by a licensed asbestos waste hauler • Disposal at an approved landfill authorized to accept asbestos waste • Completion and submission of waste manifests to the Owner upon receipt from the landfill , but no later than 15 calendar days after disposal . • No waste may leave the site without proper labeling , manifests , and documentation ...

Location

Country

United States of America (USA)

State

Missouri

Source

Source

Missouri Purchasing Group

URL

More Details

Record type

Tender

Sector

Water Supply and Storage, Commercial

Article published date

2026-04-29

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender