Moving services for the Santa Teresa DMV field office .
Sector: Energy Storage • Location: California, United States of America
Source: California Purchasing Group
( 1 ). The Contractor and the DMV Project Manager shall coordinate the delivery of boxes in advance of the move date . The Contractor shall deliver the boxes within forty - eight ( 48 ) hours of the DMV Project Managers ’ request . The DMV Project Manager shall be responsible for packing the applicable boxes
- Status
- Closed
- Sector
- Energy Storage, Rail, Manufacturing (Industrial), Commercial, Automotive, Residential
- Location
- California, United States of America
- Updated
- 3 Nov 2026
- Source
- California Purchasing Group
ConstructChat
Ask ConstructChat about Moving services for the Santa Teresa DMV field office .
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | ( 1 ). The Contractor and the DMV Project Manager shall coordinate the delivery of boxes in advance of the move date . The Contractor shall deliver the boxes within forty - eight ( 48 ) hours of the DMV Project Managers ’ request . The DMV Project Manager shall be responsible for packing the applicable boxes prior to the moving services beginning . The Contractor shall be responsible for securing the closure of the boxes . ( 2 ). At the time of arrival at the initiated DMV site , the DMV Project Manager , or their designated representative , shall provide the Contractor with an inventory list of items to be transported . The Contractor and the DMV Project Manager , or their designated representative , shall sign the inventory list . The DMV Project Manager , of their representative , shall provide a copy of the signed inventory list to the Contractor . ( 3 ). The Contractor shall provide all moving boxes , packaging tape , shrink - wrap , bubble wrap , caution tape , pallets , and any other moving supplies determined to be necessary . ( 4 ). Along with all necessary tools and equipment , the Contractor must specifically provide at the primary job site the items listed below : a . Bob - tail truck with rail - type lift gate . b . Pallet jack . c . Partition carts . d . Computer carts designed to transport computer equipment . e . Battery powered drill / screwdriver . f . Furniture pads . g . Communication radios / cell phones . h . Doorstops . i . Dollies and hand trucks . j . Heavy - duty or industrial vacuum cleaner . ( 5 ). The Contractor shall provide at least two ( 2 ) employees : one ( 1 ) driver / mover and one ( 1 ) helper , during the office move . ( 6 ). The Contractor shall be responsible to coordinate the delivery of equipment and building protection , including building access , with the DMV Project Manager , or their designated representative . |
Location
Country | United States of America (USA) |
State | California |
Source
Source | California Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Energy Storage, Rail, Manufacturing (Industrial), Commercial, Automotive, Residential |
Article published date | 2026-05-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Energy Storage tenders in United States of America
- HOUSEHOLD SINGLEUSE RECHARGEABLE BATTERY COLLECTION AND RECYCLING SERVICES
- BATTERIES FOR SURVEILLANCE EQUIPMENT
- Southeast Water Pollution Control Plant Power Feed and Prima...
- Flashlights and Batteries
- IFB 970302022LW Flashlights and Accessories
- Power Utility Rate Consulting Services for 2021 Electric Rates Study
- RFP - Portable Mass Spectrometer Device
- Southeast Water Pollution Control Plant Power Feed and Prima...
