Mulch Replenishment
The scope, dates and status of this tender. A free account opens every field.
Source: Nebraska Purchasing Group
Project Details : The successful Bidder is responsible for the following : • Remove all existing weeds and vegetation by hand or by herbicide prior to applying mulch • Apply 90 - day pre - emergent herbicide . The successful Bidder must submit the MSDS and receive MECA ’ s written approval prior to the commencemen
- Status
- Closed
- Sector
- Water Supply and Storage
- Location
- Nebraska, United States of America
- Updated
- 3 Nov 2026
- Source
- Nebraska Purchasing Group
ConstructChat
Ask ConstructChat about Mulch Replenishment
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Project Details : The successful Bidder is responsible for the following : • Remove all existing weeds and vegetation by hand or by herbicide prior to applying mulch • Apply 90 - day pre - emergent herbicide . The successful Bidder must submit the MSDS and receive MECA ’ s written approval prior to the commencement of work • Strike / trench the perimeter of all areas , including individual trees , to a depth of three ( 3 ) inches minimum and six ( 6 ) inches maximum . All dirt must be moved to an area near Lot D , designated by MECA . The trench must be filled with mulch . • For individual trees in existing turf , remove turf three ( 3 ) feet in diameter ( 1 . 5 foot radius ) around the trunk of each tree . • No mulch shall be within two ( 2 ) inches of the base of trees and other plant materials • Bidder is responsible for cleaning work area every day upon completion of work . This includes removing all debris , sweeping sidewalks , and securing all equipment • MECA will provide a staging area for equipment . The staging area for equipment will be determined by the event schedule and may change on a daily basis . Any change to equipment staging location will be communicated to the successful Bidder prior to the end of the workday . MECA is not responsible for equipment or materials in staging area . • Bidder shall be responsible for any damage caused to the surrounding area , including damage to trees , plants , irrigation lines and utilities . |
Location
Country | United States of America (USA) |
State | Nebraska |
Source
Source | Nebraska Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Water Supply and Storage |
Article published date | 2026-04-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Water Supply and Storage tenders in United States of America
- RFP - Thurston County Lake Management Districts Submerged Aquatic Vegetation Control
- Coatings for Wet Well and Manholes
- Sole Source for Wedeco UV BulbsBallets
- Security Hardware Services
- Chambers Creek Regional Wastewater Treatment Plant BNR Aeration Basin Airflow Meters
- Se Dixie Highway County Road A1A Utility Relocation Project
- UNPAINTED SNOW FENCE AND DUNE GRASS NO II
- PreQualification of Bidders for Chaboya Improvements
