Multi - Roof Replacement Project

Sector: Water Supply and Storage • Location: New Jersey, United States of America

Source: New Jersey Purchasing Group

Tender
Closed

There are several existing roofs ( C50 ESAT Building / C52 PLT Power Building / C60 C Site PumpHouse / D45 Rad Waste Handling Facility ) which are past their useful life requiring costlymaintenance to upkeep . Severe water infiltration occurs regularly at failing joints , punctures , and flashing . Portions of existing me

Status
Closed
Sector
Water Supply and Storage, Stadium, Wind, Metal, Power Generation (CCGT), Commercial, Cement
Location
New Jersey, United States of America
Updated
3 Nov 2026
Source
New Jersey Purchasing Group

ConstructChat

Ask ConstructChat about Multi - Roof Replacement Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Multi - Roof Replacement Project” is a tender record in Taiyo, linked to the Water Supply and Storage sector. It is issued for works, goods, or services related to New Jersey, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

There are several existing roofs ( C50 ESAT Building / C52 PLT Power Building / C60 C Site PumpHouse / D45 Rad Waste Handling Facility ) which are past their useful life requiring costlymaintenance to upkeep . Severe water infiltration occurs regularly at failing joints , punctures , and flashing . Portions of existing metal coping have pulled away during storm events causinglarge sections of membrane to separate from the substrate . A catastrophic failure to one ofthese roofs would negatively impact the ability to conduct the top priority experimentaloperations in the Laboratory . 1 . 2 . SCOPE1 . 2 . 1 . The Subcontractor shall provide all materials , labor , supervision , equipment , and expertiserequired replace the noted roofs and specified components per the associated contractdocuments . Construction scope includes the following : 1 . 2 . 1 . 1 . Remove and replace existing built - up roofs at PPPL . Buildings include : 1 . 2 . 1 . 1 . 1 . C50 – ESAT Building1 . 2 . 1 . 1 . 2 . C52 – PLT Power Building1 . 2 . 1 . 1 . 3 . C60 – C Site Pump House1 . 2 . 1 . 1 . 4 . D45 – Rad Waste Handling Facility1 . 2 . 1 . 2 . Demolition including removal of existing membrane , cover board , insulation , metal trim , flashing , coping and any other miscellaneous roofing material accessories . 1 . 2 . 1 . 3 . Remove and recycle stone ballast on ballasted roofs . Recycle documentation to beprovided to PPPL . 1 . 2 . 1 . 4 . Additional integrated roof elements shall be inspected and replaced as specified withinthis SOW . Elements include : wood blocking , roof drains , gutters , scuppers , downspouts , and metal / concrete roof panels . 1 . 2 . 1 . 5 . Abandoned equipment shall be removed to a point that does not affect new roofinstallation . Any equipment that should be temporarily relocated so roof replacementwork can be completed shall be the responsibility of the roofing contractor . 1 . 2 . 1 . 6 . Contractor to furnish and install 2 layers of 2 . 6 ” ISO . 1 . 2 . 1 . 7 . Contractor to furnish and install ½ ” HD coverboard mechanically fastened . 1 . 2 . 1 . 8 . Contractor to furnish and install 145 mil Carlisle Fleeceback EPDM , black in color adheredto coverboard . 1 . 2 . 1 . 9 . Contractor to furnish and install counter flashing and copings , expansion joints and otherroofing components as required for manufacturer ’ s warranty . Page 3 of 211 . 2 . 1 . 10 . The new roof system shall be comprised of the following materials : EPDM membrane , cover board , and insulation . 1 . 2 . 1 . 10 . 1 . Meets a minimum insulating value of R - 30 average . Modifications to the existingbuilding envelope are required to accommodate additional insulation . 1 . 2 . 1 . 10 . 2 . Flexible walkway pads shall be provided to all operating equipment / drain locationsand as necessary to meet manufacturer ’ s requirements . 1 . 2 . 1 . 10 . 3 . All materials shall be furnished by Carlisle Syntec Systems and shall meet allmanufacturer specifications to obtain a minimum manufacturer system warranty of30 years along with a 2 - year installers warranty . The warranty coverage shallinclude incidental membrane punctures , damage from hail and a minimum of 72 - mph peak gust wind speeds . 1 . 2 . 1 . 11 . Roof perimeter guardrails shall be provided on all roofs . See attached guardrail cut sheetfor details . 1 . 2 . 1 . 12 . New and higher curbs as required due to the new roof installation work . 1 . 2 . 1 . 13 . Contractor to build up existing roof vents as required due to the new roof work . 1 . 2 . 1 . 14 . Expansion joint to be raised up to account for new roof insulation height for the ESATbuilding roof . 1 . 2 . 1 . 15 . Contractor to add a new roof drain at the Northwest section of the ESAT building roof . 1 . 2 . 1 . 16 . Contractor to replace all existing roof scuppers with new . 1 . 2 . 1 . 17 . Contractor to replace all existing roof drains with new . 1 . 2 . 1 . 18 . Contractor to provide minimum of 12 ” overlap between the existing adjacent roofmembrane system and provide written confirmation the systems are compatible . 1 . 2 . 1 . 19 . Contractor to temporary relocate and reinstall any fall protection anchor systemsidentified on roof sections . 1 . 2 . 1 . 20 . Contractor to install secondary drainage per code in addition to existing drains for the PLTbuilding roof . 1 . 2 . 1 . 21 . If necessary , existing asbestos elements shall be mitigated by PPPL . Subcontractor toassist the abatement contractor to bring the sealed roofing material down from roof areato grade with lift equipment . Coordination of this work shall be completed in concert withall other construction activities . The subcontractor to follow directly after PPPLabatement contractor to install new roofing system . The construction subcontractor shallbe responsible to coordinate all work with PPPL . 1 . 2 . 1 . 22 . Any and all equipment that requires power disconnect has to be coordinated with PPPL aminimum of 72 hours prior . All equipment that will be out of service shall be minimized . 1 . 2 . 1 . 23 . All roof fans and equipment are to be salvaged , protected , and reinstalled . THERE ARE ( 5 ) COVER LETTER SECTIONS TO THE RFP . THERE ARE FILES ATTACHED TO EACH COVER LETTER . TO VIEW THE ATTACHMENTS YOU MUST ( 1 ) FIRST DOWNLOAD EACH COVER LETTER SECTION TO YOUR DESKTOP .( 2 ) AFTER DOWNLOADING EACH COVER LETTER -- REOPENED EACH ONE ( ON YOUR DESKTOP ) YOU SHOULD BE ABLE TO SEE THE ATTACHED FILES ON THE RIGHT HAND SIDE OF THE COMPUTER SCREEN . BE SURE TO UTILIZE ADOBE ACROBAT SOFTWARE TO VIEW THE PDF FILES

Location

Country

United States of America (USA)

State

New Jersey

Source

Source

New Jersey Purchasing Group

URL

More Details

Record type

Tender

Sector

Water Supply and Storage, Stadium, Wind, Metal, Power Generation (CCGT), Commercial, Cement

Article published date

2026-04-29

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender