logo

MUSKEGON SAND RELOCATION

One of 3,321 tenders Taiyo tracks in MITN.

Source: MITN Purchasing Group

Tender
Closed

The Park roadway from the intersection of Memorial Drive / Scenic Drive south to the turnaround in the road ( Figure 1 ) must be cleared of sand first to allow traffic access to the campground . Scope of Work for Snow Fence removal : Snow fence must be removed in a manner that will minimize damage t

Status
Closed
Sector
Road, Water Supply and Storage, Car parking, Commercial, Cement, Automotive
Location
MITN, United States of America
Updated
3 Nov 2026
Source
MITN Purchasing Group

ConstructChat

Ask ConstructChat about MUSKEGON SAND RELOCATION

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “MUSKEGON SAND RELOCATION” is a tender record in Taiyo, linked to the Road sector. It is issued for works, goods, or services related to MITN, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

The Park roadway from the intersection of Memorial Drive / Scenic Drive south to the turnaround in the road ( Figure 1 ) must be cleared of sand first to allow traffic access to the campground . Scope of Work for Snow Fence removal : Snow fence must be removed in a manner that will minimize damage to the fence and posts to preserve it for future use . All fence material is to be rolled in tight rolls not to exceed 50 feet in length . Fence posts must be removed in such a manner to prevent bending and distorting . All materials used to attach fence to posts and fence to fence are to be removed from the beach by the contractor . Fence and posts are to be stacked in a central location or on a trailer provided by the park in the proximity of the job site as designated by the Park Supervisor or his representative . Scope of Work for Sand Removal : NEW FOR 2026 : Construction on a new beach house is being completed . The fenced in construction area around the beach house ( Figure 3 ) is not in the Scope of Work for 2026 . Remove all sand accumulations from between the parking lots , from paved roadways , from paved parking lots , from around the beach building and sidewalks , from the east shoulder of the park road , and from both sides of the park road north and south of the parking lot a distance to be established by the Park Supervisor . The shoulders of the park road and the north and south ends of the parking lots are to be cleared a minimum of 12 feet but not more than 15 feet from the paved edge on a level grade even with the road surface . Sand areas located between concrete surfaces or roads and parking lots must be excavated and finished to a grade no higher than the surrounding paved surfaces . All sand that has been removed shall be deposited and rough graded on the beach or low areas in the parking lot medians or the building . Grading on the beach is to be a gradual slope from the parking lot edge to the water ’ s edge of Lake Michigan as determined by the Park Supervisor or his representative .

Location

Country

United States of America (USA)

State

MITN

Source

Source

MITN Purchasing Group

URL

More Details

Record type

Tender

Sector

Road, Water Supply and Storage, Car parking, Commercial, Cement, Automotive

Article published date

2026-04-29

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender