N045--Loch Raven Vamc Bldg. 6 Boiler Replacement Request For Quote
Combined synopsis/solicitation · Maryland
Source: SAM.gov
Page 1 of 1 SCOPE OF WORK LR Bldg 6 Boiler Replacement Project: 512-25-052 GENERAL SCOPE OF WORK: The contractor will provide all material, labor, equipment, and supervision necessary to complete the above-named project at the VA Maryland Health Care System (VAMHCS), Loch Raven Campus. Contractor is to remove the existing boiler in the Building 6 mechanical room a Weil McClain Water Tube Boiler ra
- Status
- Closed
- Sector
- Water Supply and Storage, Power Transmission, Power Generation (CCGT), Commercial, Metal, Residential
- Location
- Baltimore, Maryland, United States of America
- Updated
- 3 Nov 2026
- Source
- SAM.gov
ConstructChat
Ask ConstructChat about N045--Loch Raven Vamc Bldg. 6 Boiler Replacement Request For Quote
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | combined synopsis/solicitation |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Page 1 of 1 SCOPE OF WORK LR Bldg 6 Boiler Replacement Project: 512-25-052 GENERAL SCOPE OF WORK: The contractor will provide all material, labor, equipment, and supervision necessary to complete the above-named project at the VA Maryland Health Care System (VAMHCS), Loch Raven Campus. Contractor is to remove the existing boiler in the Building 6 mechanical room a Weil McClain Water Tube Boiler rated at 209MBH and replace it with a CSD-1 compliant boiler on the existing equipment pad. The old boiler should be properly disposed of after removal with disposal receipts provided to VA. New boiler should use existing utility lines for tie-in s where possible except for the existing Vent line. Per NBCI code, the vent line must be PVC and the atmospheric metal duct deteriorate. Contractor to confirm feasibility of utility line tie-ins and vent line replacement during pre-bid walk through. Utility tie-ins may require minor modifications to fit the existing space and new boiler. Contractor to follow boiler manufacturer install instructions for proper installation. Contractor will provide materials to meet ICRA requirements set forth by safety based on the work to be completed. Contractor to provide warranty and start-up after install of new boiler to confirm proper operation. Remove and dispose of existing Weil McClain Water Tube Boiler (209MBH). Provide disposal receipts to VA. Provide and install CSD-1 compliant Boiler sized to match existing boiler. Utilize existing utility lines for tie-ins where possible except for the vent line. New PVC vent line must be installed. Contractor to adhere to any and all local, state, federal, and VA specifications and guidelines. Work will be completed in 30 calendar days from Notice To Proceed. |
Original sector | Construction |
Location
Country | United States of America (USA) |
State | Maryland |
City | Baltimore |
Source
Source | SAM.gov |
URL |
More Details
Record type | Tender |
Sector | Water Supply and Storage, Power Transmission, Power Generation (CCGT), Commercial, Metal, Residential |
Article published date | 2025-11-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Water Supply and Storage tenders in United States of America
- RFP - Thurston County Lake Management Districts Submerged Aquatic Vegetation Control
- Coatings for Wet Well and Manholes
- Sole Source for Wedeco UV BulbsBallets
- Security Hardware Services
- Chambers Creek Regional Wastewater Treatment Plant BNR Aeration Basin Airflow Meters
- Se Dixie Highway County Road A1A Utility Relocation Project
- UNPAINTED SNOW FENCE AND DUNE GRASS NO II
- PreQualification of Bidders for Chaboya Improvements
