N1490 Fire Station 8 HVAC Replacement
The scope, dates and status of this tender. A free account opens every field.
Source: Arlington County Government
This new Fire Station 8 project consists of replacing the existing roof mounted 25 ton air handling unit with a new 30 ton unit which will be able to meet the revised standard of 68 degrees at 50 â 60% humidity for 24 hours a day, seven days a week. The project includes removal of the existing unit, replacement with a new unit, minor structural reinforcing to carry the load of the new unit. Th
- Status
- Closed
- Sector
- Steel, Government, Commercial
- Location
- Virginia, United States of America
- Updated
- 3 Nov 2026
- Source
- Arlington County Government
ConstructChat
Ask ConstructChat about N1490 Fire Station 8 HVAC Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | This new Fire Station 8 project consists of replacing the existing roof mounted 25 ton air handling unit with a new 30 ton unit which will be able to meet the revised standard of 68 degrees at 50 â 60% humidity for 24 hours a day, seven days a week. The project includes removal of the existing unit, replacement with a new unit, minor structural reinforcing to carry the load of the new unit. The new unitâs enthalpy wheel will increase energy efficiency by transferring both sensible and latent energy from toilet and bath exhaust air to incoming outdoor air. The project includes minor modifications to the existing ductwork. The existing structure is a steel framed three story structure. The building was built to meet the 2015 Virginia Uniform Statewide building code. The scope also includes removing and replacing the acoustical tile ceiling in the Day Room and part of the adjacent Corridor. The existing roof is a single ply, fully adhered EPDM roof. The sprinklers will need to be adjusted to the height of the new ceiling in the day room. |
Original sector | Construction |
Location
Country | United States of America (USA) |
State | Virginia |
Source
Source | Arlington County Government |
URL |
More Details
Record type | Tender |
Sector | Steel, Government, Commercial |
Article published date | 2026-10-23 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Steel tenders in United States
- Mill and overlay, replacement of 1 structure; Involving stripping, storing, and placing topsoil, excavation, reinforcing subgrade, placing road base, asphalt pavement, structural steel, riprap, and structural concrete, and installing fence on WYO 59
- Bridge rehabilitation and electrical upgrades; Involving removing concrete, excavation, replacing concrete slabs, placing structural steel, installing bridge railing and sheet piles, placing approach slabs, riprap, bridge deck overlay, and structural
- Bridge rehabilitation and electrical upgrades; Involving removing concrete, excavation, replacing concrete slabs, placing structural steel, installing bridge railing and sheet piles, placing approach slabs, riprap, bridge deck overlay, and structural
- Bridge replacement (1 concrete bridge); Involving installing cofferdams, removing one concrete bridge, placing structural steel, installing bridge railing, pedestrian railing, and steel piling, placing riprap, and installing reinforcing steel and pla
- Bridge replacement (1 Structure); Involving removing one steel bridge, excavation, grading, placing road base and prestressed precast concrete girders, installing bridge railing and steel piling, placing riprap, installing reinforcing steel, and plac
- DR19309, DR19004 & DR19622 combined Bridge repairs (3 structures); Involving installing controls for lead paint removal, removing concrete, placing structural steel, installing bridge railing, paint removal and repair, and repairing structural concre
- Slide Repair; Involving excavation; stripping, storing, and placing topsoil; placing erosion control measures, asphalt pavement, slide stabilization rock, and shotcrete; and installing reinforcing steel and timber lagging on US 26/89 beginning at RM
- Slide Repair; Involving excavation; stripping, storing, and placing topsoil; placing erosion control measures, asphalt pavement, slide stabilization rock, and shotcrete; and installing reinforcing steel and timber lagging on US 26/89 beginning at RM
