National Gallery Research Centre Fit Out
Sector: Education • Location: United Kingdom
Source: Open Contracting Data Standard (OCDS)
The purpose of this project is to create a connection between the Sainsbury Wing and Wilkins Building and transforming an existing space into a modern, functional research facility designed for both staff and public use. The works are divided into two distinct contracts: Structural Works Package - covering structural and excavation works. Fitout Works Package - covering the fit-out and completion
- Status
- Bidding
- Sector
- Education, Commercial
- Location
- United Kingdom
- Updated
- 3 Nov 2026
- Source
- Open Contracting Data Standard (OCDS)
ConstructChat
Ask ConstructChat about National Gallery Research Centre Fit Out
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | active |
Taiyo status | Bidding |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The purpose of this project is to create a connection between the Sainsbury Wing and Wilkins Building and transforming an existing space into a modern, functional research facility designed for both staff and public use. The works are divided into two distinct contracts: Structural Works Package - covering structural and excavation works. Fitout Works Package - covering the fit-out and completion of the facility. This Tender relates specifically to the Fitout Works portion of the project. The anticipated scope of works includes: -Installation and commissioning of all MEP systems. -Installation of all wall, floor and ceiling finishes. -Installation of joinery elements such as desks, library shelving and seating areas to form libraries and study rooms. -Construction of access elements such as stairs The contract start date of April 2026 is in advance of mobilisation and site handover to allow for the contractor involvement in taking the designs to stage 5. Mobilisation is to be no later than 27 May 2027 Contract completion date is an estimate, to be agreed with the contractor. |
Location
Country | United Kingdom (UK) |
Source
Source | Open Contracting Data Standard (OCDS) |
URL |
More Details
Record type | Tender |
Sector | Education, Commercial |
Article published date | 2026-04-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Education tenders in United Kingdom
- SUMIT Project Hardware and Connectivity Services
- Laboratory Consumables and Chemicals
- LAB1040 AP - Mass Spectrometry & Chromatography Equipment (APUC)
- SUMIT Project - Provision of Digital Products
- SUMIT Project - Provision of Digital Products
- QSB442 0900 2026-05-19 Lavenham – Sudbury library, Sudbury (4-seated vehicle required)
- Client Transport Services 2026 - 2034 - SEND
- Lexis Plus Academic Library
