logo

National Highways Electric Vehicle Charging Infrastructure Solutions

The scope, dates and status of this tender. A free account opens every field.

Source: Open Contracting Data Standard (OCDS)

Tender
Planning

NH are aiming to have Net Zero corporate emissions by 2030. The electrification of its vehicle fleet is a pivotal piece in this wider ambition and therefore it is crucial for NH to provide charging provision for its Electric Vehicles (EV) to ensure the reliable and safe operation of the Strategic Road Network. NH aims to deliver fast to ultra-rapid charging at priority sites with each site having

Status
Prospective
Sector
Electric Vehicles (EVs), Automotive, Road
Location
United Kingdom
Updated
3 Nov 2026
Source
Open Contracting Data Standard (OCDS)

ConstructChat

Ask ConstructChat about National Highways Electric Vehicle Charging Infrastructure Solutions

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “National Highways Electric Vehicle Charging Infrastructure Solutions” is a tender record in Taiyo, linked to the Electric Vehicles (EVs) sector. It is issued for works, goods, or services related to United Kingdom.

Participants

Not available for this record.

Status

Original status

planning

Taiyo status

Prospective

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

NH are aiming to have Net Zero corporate emissions by 2030. The electrification of its vehicle fleet is a pivotal piece in this wider ambition and therefore it is crucial for NH to provide charging provision for its Electric Vehicles (EV) to ensure the reliable and safe operation of the Strategic Road Network. NH aims to deliver fast to ultra-rapid charging at priority sites with each site having a tailored solution based on specific needs of the users on site. Due to business demand, the programme of works will need to work at pace to address operational risks with the ambition to deliver the proposed EV charging installations by the end of March 2027. NH are targeting a contract award of no later than September 2026. We understand this programme is challenging and would be looking to work with a supplier who has a proven track record of delivering full solutions at scale and pace. On completion of installations, NH would be looking to enter into a further service level agreement with the installer which would see the supplier take on accountability for the maintenance and continued operationality of the installed chargers, providing a reliable and resilient service to the NH fleet. A further list of services is included within the market engagement form, linked in the Engagement section of this notice. Once the closing date for market engagement responses have passed, National Highways will analyse the results and this will inform a procurement strategy, the details of which are still to be determined. National Highways reserve the right to procure via a route to market which they deem appropriate based on findings. This includes existing Framework routes. Equally, National Highways reserve the right not to procure these services at its discretion. The responses submitted to this questionnaire are for information only and do not constitute a formal submission. All value information provided at this stage is an estimate and should not be relied upon until confirmed within the procurement.

Location

Country

United Kingdom (UK)

Source

Source

Open Contracting Data Standard (OCDS)

URL

More Details

Record type

Tender

Sector

Electric Vehicles (EVs), Automotive, Road

Article published date

2026-04-02

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender