National road 13 Røynevarden 2026
One of 10,000+ tenders Taiyo tracks in Norway.
Source: TED Europa
The work in this contract is to expand the tunnel profile, including the water and frost protection zone (cladding), shall at least fulfil the geometric requirements for normal profile T8.5. In areas where water and frost protection is not established in this contract, the tunnel profile shall be designed so that any later establishment of water and frost protection can be carried out without redu
- Status
- Closed
- Sector
- Road, Water Supply and Storage, Tunnel, Bridge
- Location
- Norway
- Updated
- 3 Nov 2026
- Source
- TED Europa
ConstructChat
Ask ConstructChat about National road 13 Røynevarden 2026
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | contract notice |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The work in this contract is to expand the tunnel profile, including the water and frost protection zone (cladding), shall at least fulfil the geometric requirements for normal profile T8.5. In areas where water and frost protection is not established in this contract, the tunnel profile shall be designed so that any later establishment of water and frost protection can be carried out without reducing the tunnel profile under the geometric requirements of T8.5. The contract also includes: • Assembly of fixing bolts and a complete cable bridge. The lowest equipment in the hanger is minimum 5.0 m in height. • Disassembly of existing lighting. • Assembly of new led lighting in accordance with light calculations carried out by the contractor. • Disassembly of side markers, protruding objects and hump. • Disassembly of the existing pe-foam, samples of pe-foam shall be taken and delivered to the builder before delivery to an approved disposal site. • Bolting and securing in accordance with the attached amount in D1.4. Contractor must remove protruding bolts. • The asphalt shall be protected and damages/markings must be continually maintained by the contractor. • H2 edges in the portal areas must be removed and re-established in this contract as well as new establishment c.f. D1.1. • Temporary lighting is required. • Scan with a fixed mark before and after the work starts and completed. • The geological final report shall be submitted to the builder 1 month before completion. |
Original sector | Construction work, Construction work, Construction work |
Location
Country | Norway |
Source
Source | TED Europa |
URL |
More Details
Record type | Tender |
Sector | Road, Water Supply and Storage, Tunnel, Bridge |
Article published date | 2026-03-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Road tenders in Norway
- Design-Bid-Build (Dbb) Construction Of A Base Perimeter Security Fence, Rygge Air Station, Norway
- Freight contract RA
- Framework agreement for planning and engineering design services for Rogaland county 2026-2030
- Procurement - Competitive tendering of Hatlane Care Centre, 2025
- Asphalt contract Nedre Buskerud and Akershus West
- The collection and treatment of wood from the recycling station at FREVAR KF
- Covering Vestland 2026: SABO, BOA and Nordhordland
- Water and sewage - Project and other municipal engineering work - framework agreement.
