Network Connectivity
Sector: Broadband • Location: MITN, United States of America
Source: MITN Purchasing Group
He solution must provide at least 1Gbps connectivity between the two locations noted below : Mt . Morris EAJ High School ( location 1 ) 8041 Neff Rd , Mt Morris , MI 48458 From location 1 , the distance to the closest network closet is approximately 250 ’. Vendor will be required to make this connection as
- Status
- Closed
- Sector
- Broadband, Seaport, Telecommunications, Metal, Power Generation (CCGT)
- Location
- MITN, United States of America
- Updated
- 3 Nov 2026
- Source
- MITN Purchasing Group
ConstructChat
Ask ConstructChat about Network Connectivity
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | He solution must provide at least 1Gbps connectivity between the two locations noted below : Mt . Morris EAJ High School ( location 1 ) 8041 Neff Rd , Mt Morris , MI 48458 From location 1 , the distance to the closest network closet is approximately 250 ’. Vendor will be required to make this connection as well . Mt . Morris EAJ High School Athletics Complex ( location 2 ) Press Box The Athletics Complex is located approximately 1 , 600 feet north of Mt . Morris EAJ High School . The district will consider any connectivity options , including , but not limited to , wireless point to point or fiber optics . If using physical cable , it must be underground . Underground cable must be able to be located / traced . Vendor is responsible for any permits , MISSDIG , Make Ready , and other installation requirements . If applicable , Include in costs for yearly maintenance , support , or licensing . Provide optional cost for 3 years of maintenance , support , and licensing . The solution must be able to pass at least seven ( 7 ) VLANs between both locations . Vendor must include expected latency between both locations . Prefer latency below 1ms . OPTIONAL HARDWARE Solution must include a 24 port Enterprise Network Switch with PoE ++. 24 Port PoE Enterprise Network Switch 24x 10 / 100 / 1000 copper ports 4x SFP + ports with speeds of at least 1Gb Full Power PoE ++ available on all ports Layer 2 capabilities Reference model - Ruckus ICX 8200 - 24ZP Multigigabit PoE Quantity : 1 Solution must also include external Enterprise Access Points Wi - Fi 6 or better 3x3 : 3 or better Include separate line item for mount Include separate line item for installing network cabling back to network switch . Include separate line item for optional installation Include separate line item for 3 years of support / maintenance Reference Model - Ruckus T750 Quantity : 3 |
Location
Country | United States of America (USA) |
State | MITN |
Source
Source | MITN Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Broadband, Seaport, Telecommunications, Metal, Power Generation (CCGT) |
Article published date | 2026-04-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Broadband tenders in United States of America
- Geary Blvd. Sewer and Water Improvements
- Broadband Partnership
- Construction Manager Risk CMAR East Park P0625
- Web Content Management System Replacement
- Bay Corridor Transmission and Distribution - Phase 3 (2019) ...
- Design-Build Services for San Joaquin Valley Communication S...
- CANCELLED - Alameda Creek Recapture - Barge System Supplier ... Cost:
- 40 Gigabits per Second Collocation Switch Between VTA and Internet Service Provider Internet Point of Presence
