Neuse River Resource Recovery Facility
One of 10,000+ tenders Taiyo tracks in North Carolina.
Source: North Carolina Purchasing Group
1 . Removal • Disconnect and remove existing 2 , 000 Gallon Fuel Above Ground Storage Tank . • Properly dispose of the old AST per local regulations . 2 . AST Replacement • Supply a new 2 , 000 gallon AST that is UL 2085 compliant . • Transportation of AST and equipment to the site , and storage of AST and
- Status
- Closed
- Location
- North Carolina, United States of America
- Updated
- 3 Nov 2026
- Source
- North Carolina Purchasing Group
ConstructChat
Ask ConstructChat about Neuse River Resource Recovery Facility
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | 1 . Removal • Disconnect and remove existing 2 , 000 Gallon Fuel Above Ground Storage Tank . • Properly dispose of the old AST per local regulations . 2 . AST Replacement • Supply a new 2 , 000 gallon AST that is UL 2085 compliant . • Transportation of AST and equipment to the site , and storage of AST and equipment on site are the responsibility of the contractor . 3 . Installation : • Install the new UL 2085 AST in the same physical location . • install 3 " fill piping for remote fill ; install product piping ; • install Wayne dispenser supplied by customer and connect to existing fuel controller • install bollards around tank and dispenser . • Haul and dispose of all debris . 4 . Instrumentation • Furnish and install new tank gauge that will integrate with the E . J . Ward Fuel Management system ( Omntec Tank Monitor ). 5 . Commissioning & Testing : • Perform startup and performance testing . • Coordinate with facility management for final acceptance testing . 6 . Documentation : • Provide complete warranty information to city staff . 7 . Work Hours • All work is to be performed during normal business hours ( Monday to Friday from 7 : 30 am to 3 : 30 pm ) unless otherwise specified . |
Location
Country | United States of America (USA) |
State | North Carolina |
Source
Source | North Carolina Purchasing Group |
URL |
More Details
Record type | Tender |
Article published date | 2026-05-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More infrastructure tenders in United States of America
- RFP - Pro-Tem Hearing Examiner
- RFP - Thurston County Lake Management Districts Submerged Aquatic Vegetation Control
- Coatings for Wet Well and Manholes
- Veteran Transportation
- Countywide Vending Machine Services with Healthy Options
- Temporary Staffing Services Local and National
- NEW TIRES RETREADS AND TIRE SERVICES
- Youth Suicide Prevention Programming
