New Containment Cell upgrade - Cap-Lumière, Kent County, New Brunswick
The scope, dates and status of this tender. A free account opens every field.
Source: Canada Buy and Sell
Title New Containment Cell upgrade
Location Cap-Lumière, New-Brunswick
General Requirements In general, the work under this contract at Cap-Lumière harbour located in New-Brunswick covers, but is not limited to the following; furnishing of all labour, all products (i.e.: materials, machinery, equipment and appliances), all construction material and all services that may be necessary f
- Status
- Closed
- Sector
- Steel, Seaport
- Location
- Canada
- Updated
- 3 Nov 2026
- Source
- Canada Buy and Sell
ConstructChat
Ask ConstructChat about New Containment Cell upgrade - Cap-Lumière, Kent County, New Brunswick
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | open |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Title New Containment Cell upgrade Location Cap-Lumière, New-Brunswick General Requirements In general, the work under this contract at Cap-Lumière harbour located in New-Brunswick covers, but is not limited to the following; furnishing of all labour, all products (i.e.: materials, machinery, equipment and appliances), all construction material and all services that may be necessary for the execution of the work in accordance with the contractual documents for the construction of a new containment cell at Cap-Lumiere, Kent County, New Brunswick. The work covered by this contract includes, but is not limited to: 1 Removal of existing armour stone to excavation limit and disposal to the designated area; 2 Reshape the existing armour stone to suit the new berm construction; 3 Supply and placement of new corestone, filterstone and armourstone including geotextile shown on the drawing. Contract includes mobilization and demobilization all equipment necessary to make work progress for the entire contract, including environmental controls and all associated items in strict accordance with specifications and accompanying drawings and subject to all terms and condition of this contract. Familiarization with Site Before submitting a bid, it is recommended that bidders visit the site and its surroundings, at their own expense and schedule, to review and verify the form, nature and extent of the work, materials necessary for the completion of the works, the means of access to the site, severity, exposure and uncertainty of weather, soil conditions, any accommodations they may require, and in general shall obtain all necessary information as to risks, contingencies and other circumstances which may influence or affect their bid. No allowance shall be made subsequently in this connection on account of error or negligence to properly observe and determine the conditions that will apply. Take all appropriate safety measures before conducting any visit to site. All work must be substantially completed by May 2nd, 2026. |
Location
Country | Canada |
Source
Source | Canada Buy and Sell |
URL |
More Details
Record type | Tender |
Sector | Steel, Seaport |
Article published date | 2025-11-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
